Wednesday,
11/04/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0745-0800
|
SR
Fill 324 Singlets Non
Top-Up
|
OPS
|
|
|
0800-1200
|
RG2 Kicker Validation
|
S. Pasky
|
|
|
1300-1500
|
Refresh Linac SF6 in Zones B and C.
|
W. Michalek
|
Linac RF systems L1 - L3
should be shutdown! WR26389
|
|
1100-1900
|
L4 RF Conditioning
|
OPS
|
Rf conditioning progress to be recorded in operation on-line log.
Suggested
Procedure provided by CO..
|
|
1900-2000
|
Injector
Recovery / SR Fill
|
OPS
|
324
Singlets
|
|
2000-2400
|
L4 RF Conditioning
|
OPS
|
Rf conditioning progress to be recorded in operation on-line log.
SLOWLY!!!!
|
|
Thursday,
11/05/09
|
Time
|
Description
|
Studiers
|
Comment
|
|
0000- 0700
|
L4 RF Conditioning
|
OPS
|
Rf conditioning progress to be recorded in operation on-line log.
SLOWLY!!!! (Goal 138MW SLED)If this
power is reached
attempt operating L5 down L4 providing 325MeV. Save File
|
|
0700-0800
|
Injector
Recovery/SR Fill
|
OPS
|
324
Singlets
|
|
0900-1100
|
Console Test (Booster)
|
D.Weyer
|
|
|
1100-1500
|
Linac/Par Studies
|
S. Pasky/R.Soliday
|
PEMtool Testing
|
|
1500-1900
|
L5 RF Conditioning
|
OPS
|
Rf conditioning progress to be recorded in
operation on-line log.
Suggested
Procedure provided by CO, pay close attention to L5:BL:VP:CO3.
|
|
1900-2000
|
Injector
Recovery/SR Fill
|
OPS
|
324
Singlets
|
|
2000-2400
|
L5 RF Conditioning
|
OPS
|
Rf conditioning progress to be recorded in operation on-line log.
SLOWLY!!!!
|
|
Friday,
11/06/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0000 - 0500
|
L5 RF Conditioning
|
OPS
|
Rf conditioning progress to be recorded in operation on-line log.
SLOWLY!!!!(Goal 138MW SLED)If rf
power is reached
attempt operating L4 down L5 providing 325MeV. Save File
|
|
0500-0700
|
Restore
Normal operations using RG2. |
OPS |
|
|
0700-0800
|
Injector
Recovery/SR Fill
|
OPS
|
324
Singlets
|
|
0800-1200
|
Test Sequence Program
|
A. Pietryla
|
|
|
1200-1900
|
L5 RF Conditioning
|
OPS
|
Continue to operator L5 SLED at a higher power level
~ (70MW). Setup L4 power to maintain the required 325Mev.
|
|
1900-2000
|
Injector
Recovery/SR Fill
|
OPS
|
324
Singlets
|
|
2000-2400
|
Setup Normal operations using RG1.*
(Do
not standardize LTP/PAR/PTB or change Par RF)
|
OPS
|
Use LPL_Configure PEMtool.
*Deselect linac
L4 and
L5 rf systems and LTP, PAR, PTB
Restore "Sys. Ref. High Charge RG1->PAR->BS 325MeV"
Observe gun startup - this is a new cathode - the final gun charge
will be 250ma.
|
|
Saturday,
11/07/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0000-0700
|
RG1 operation continued ..........
|
OPS
|
Check
transport efficiency to the booster.
Save file.
|
|
0700-0800
|
Injector
Recovery/SR Fill
|
OPS
|
324
Singlets
|
|
0800-1030
|
"Operators Challenge"
|
OPS
|
Operators challenge to perform manual LTP
steering. ACO setup and monitor -
- Disable LTP
control-law
- Move all LTP
correctors
- Challenger -
- Save file
w/challengers name
- Manual steer
- When good
transport is established
- Save
file
|
|
1200-1900
|
L5 RF Conditioning
|
OPS
|
Continue to operator L5 SLED at a higher power
level
~ (70MW). Setup L4 power to maintain the required 325Mev.
|
|
1900-2000
|
Injector
Recovery/SR Fill
|
OPS
|
324
Singlets
|
|
2000-0000
|
"Operators Challenge"
|
OPS
|
Operators challenge each other by creating faults that are to be
diagnosed and discovered.
|
|
Sunday,
11/08/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0000-0200
|
Setup K2 down using RG1.*
(Do
not standardize Linac/LTP/PAR/PTB
or change Par RF)
|
OPS
|
Use LPL_Configure PEMtool.
*Deselect linac L4 and
L5, rf systems.
Restore "Sys. Ref. High Charge RG1->PAR->BS 325MeV"
|
|
0200-0700
|
Continued K2 down using RG1.*
|
OPS
|
Check transport efficiency to
the booster.
Save file. |
|
0700-0800
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
0800-1100
|
Restore
Normal operations using RG2.
|
OPS |
Use LPL_Configure PEMtool.
*Deselect linac L4 and
L5, rf systems when using
Sys. Ref. High Charge RG2->PAR->BS 325MeV or
operator preferred. |
|
1200-1500
|
Setup K2 down using RG2.*
(Do
not standardize Linac/LTP/PAR/PTB
or change Par RF)
|
OPS
|
Use LPL_Configure PEMtool.
*Deselect linac L4 and
L5, rf systems when using
Sys. Ref. K2 Down RG2->PAR->BS 325 MeV. |
|
1600-1900
|
Restore
Normal operations using RG2.
|
OPS |
Use LPL_Configure PEMtool.
*Deselect linac L4 and
L5, rf systems when using
Sys. Ref. High Charge RG2->PAR->BS 325MeV or
operator preferred.
|
|
1900-2000
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
2000-2400
|
"Operators Challenge"
|
OPS
|
Operators challenge each other by creating faults that are to be
diagnosed and discovered.
|
|
Monday,
11/09/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0000-0700
|
"Operators Challenge"
|
OPS
|
Operators challenge each other by creating faults that are to be
diagnosed and discovered.
|
|
0700-0800
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
0800-1200
|
Test Sequence Program
|
A. Pietryla
|
|
|
1200-1500
|
Linac/Par Beam Studies
|
S.Pasky
|
|
|
1900-2000
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
2000 - 0000
|
L5 RF Conditioning
|
OPS
|
Rf conditioning progress to be recorded in operation on-line log.
SLOWLY!!!!(Goal 138MW SLED)If rf
power is reached
attempt operating L4 down L5 providing 325MeV. Save File
|
|
Tuesday,
11/10/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0000-0200
|
L5 RF Conditioning
|
OPS
|
Rf conditioning progress to be recorded in operation on-line log.
SLOWLY!!!!(Goal 138MW SLED)If rf
power is reached
attempt operating L4 down L5 providing 325MeV. Save File
|
|
0200-0800
|
Restore L4 and L5 RF SLED power to 40MW each.
|
OPS
|
Verify beam transport to booster and save files...
|
|
0800 -
|
Machine
Studies Period
|
|
Wednesday,
11/11/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0000-0700
|
|
|
|
|
0700-0800
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
0800-1200
|
Interface L1:CM1 and CM2
|
A. Pietryla/C.Gold
/R.Keane/S.Pasky
|
Investigate timing issues with L1:CM1
and L1:CM2
Current monitiors. L1:CM1 will not work properly without
someone changing the timing on the local DG-535.
|
|
1200-1500
|
Linac/Par/Booster Beam Studies
|
S.Pasky
|
|
|
1500-1700
|
Restore
Normal operations using RG2. |
OPS |
|
|
1700-2000
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
2000-2400
|
Setup Normal operations using RG1.*
(Do
not standardize LTP/PAR/PTB or change Par RF)
|
OPS
|
Use LPL_Configure PEMtool.
*Deselect
linac L4 and L5, rf systems!!!!.
Restore "Sys. Ref. High Charge
RG1->PAR->BS 325MeV" |
|
Thursday,
11/12/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0000-0700
|
RG1 operation continued ..........
|
OPS
|
Check
transport efficiency to the booster.
Save file.
|
|
0700-0800
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
0800-1400
|
RG1 Kicker Validation
|
S. Pasky
|
|
|
1400-1600
|
Linac RF Souce Maintenance
|
A. Grelick, D. Jefferson
|
Adjust the amplitude from the 119 MHz Linac Source
chassis to match that from the synthesizer source.
Note -
shutdown all linac klystrons while doing this.
|
|
1700-2000
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
2000-0000
|
Restore
Normal operations using RG2.
|
OPS |
Use LPL_Configure PEMtool.
*Deselect linac L4 and
L5, rf systems when using
Sys. Ref. High Charge RG2->PAR->BS 325MeV or
operator preferred. |
|
Friday,
11/13/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0000-0200
|
continued - Normal operations using RG2
|
OPS
|
|
|
0700-0800
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
0900-1200
|
Booster Injection Kicker Testing
|
A. Hillman /S.Pasky
|
Correlate dropouts in BTS
charge with the booster
injection kicker |
|
1200-1900
|
L5 RF Conditioning
|
OPS
|
Operator L5 SLED at a higher power level
~ (70MW). Setup L4 power to maintain the required 325Mev.
|
|
1900-2000
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
2000-2400
|
Setup Normal operations using RG1.*
(Do
not standardize LTP/PAR/PTB or change Par RF)
|
OPS
|
Use LPL_Configure PEMtool.
*Deselect linac
L4 and
L5 rf systems and LTP, PAR, PTB
Restore "Sys. Ref. High Charge RG1->PAR->BS 325MeV"
Observe gun startup - this is a new cathode - the final gun charge
will be 250ma.
|
|
Saturday,
11/14/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0000-0700
|
RG1 operation continued ..........
|
OPS
|
Check
transport efficiency to the booster.
Save file.
|
|
0700-0800
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
0800-1030
|
"Operators Challenge"
|
OPS
|
Operators challenge to perform manual LTP
steering. ACO setup and monitor -
- Disable LTP
control-law
- Move all LTP
correctors
- Challenger -
- Save file
w/challengers name
- Manual steer
- When good
transport is established
- Save
file
|
|
1200-1900
|
L5 RF Conditioning
|
OPS
|
Operator L5 SLED at a higher power level
~ (70MW). Setup L4 power to maintain the required 325Mev.
|
|
1900-2000
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
2000-2400
|
L5 RF Conditioning
|
OPS
|
Continue to operator L5 SLED at a higher power level
~ (70MW). Setup L4 power to maintain the required 325Mev.
|
|
Sunday,
11/15/09
|
Time
|
Description
|
Studiers
|
Comments
|
|
0000-0700
|
L5 RF Conditioning
|
OPS
|
Continue to operator L5 SLED at a higher power level
~ (70MW). Setup L4 power to maintain the required 325Mev.
|
|
0700-0800
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
0800-1100
|
Restore
Normal operations using RG2.
|
OPS |
Use LPL_Configure PEMtool.
*Deselect linac L4 and
L5, rf systems when using
Sys. Ref. High Charge RG2->PAR->BS 325MeV or
operator preferred. |
|
1100-1900
|
L5 RF Conditioning
|
OPS
|
Continue to operator L5 SLED at a higher power level
~ (70MW). Setup L4 power to maintain the required 325Mev.
|
|
1900-2000
|
Injector
Recovery/SR Fill.
|
OPS
|
324
Singlets
|
|
2000-2400
|
Restore L4 and L5 RF SLED power to 40MW each.
|
OPS
|
Verify beam transport to booster and save files...
|
|
Monday,
11/16/09
|
|
0000-0800
|
Maintain Normal operations using RG2. |
OPS
|
|
|
0800 -
|
Machine
Studies Period
|