Listing of Statistics for Run3-2009 (Created Sat Nov 07 14:05:28 CST 2009)
User periods in this interval
10/06/2009 08:00 To 10/13/2009 08:00 168.00 Hours, Delivered Beam: 159.72 Hours, 6 Fault(s), 26.62 MTBF, 95.07% of Sched. Time
10/14/2009 08:00 To 10/19/2009 08:00 120.00 Hours, Delivered Beam: 113.32 Hours, 2 Fault(s), 56.66 MTBF, 94.44% of Sched. Time
10/21/2009 08:00 To 10/27/2009 08:00 144.00 Hours, Delivered Beam: 144.00 Hours, 0 Fault(s),144.00 MTBF,100.00% of Sched. Time
10/28/2009 08:00 To 11/03/2009 08:00 145.00 Hours, Delivered Beam: 144.53 Hours, 1 Fault(s),144.53 MTBF, 99.67% of Sched. Time
11/04/2009 08:00 To 11/07/2009 14:03 78.05 Hours, Delivered Beam: 78.04 Hours, 0 Fault(s), 78.04 MTBF, 99.99% of Sched. Time
| Total Amount of User Time in this interval | 655.02 Hours | Delivered Beam | 639.61 Hours |
| Percentage of Scheduled Time (*) | 97.65 % |
| Mean Time Between Faults (MTBF) | 71.07 Hours |
| Downtime During Period | 15.41 Hours |
| Total integrated Current During This Period | 64.65 A-hr |
| Mean Fill Duration in Period | 63.96 Hours |
| Faults per Day of Delivered Beam | 0.34 |
| Total Number of Faults | 9 |
| Valid fills Beginning in this Time Interval |   |   |   |
| Fill # | Start |   | End | Duration (min: 1.0) | Reason for Fill Termination | Length of Downtime | Downtime is associated with the end of a fill. The first fill of a period will have any downtime before the fill on the line above.
|
|
|   | 0.00 |
|
| # 1 | 10/06 08:00 | To | 10/06 13:18 | 5.31    | CU steering failure[PS] | 0.70 | Investigation and refill
|
| # 2 | 10/06 14:00 | To | 10/06 16:56 | 2.92    | RF4 HVPS trip [RF] | 0.44 | Investigation, refill
|
| # 3 | 10/06 17:22 | To | 10/06 19:27 | 2.08    | PS DAC error [CTL] | 5.10 | 2nd beam loss,IOCS37BPM failed[CTL]
|
| # 5 | 10/07 00:33 | To | 10/08 15:46 | 39.23    | CPU AFG malfunction[CTL] | 0.38 | Investigation, refill
|
| # 6 | 10/08 16:09 | To | 10/09 14:59 | 22.82    | S26B:Q5:PS glitch [PS] | 1.29 | Investigtion, swap-out supply, refill
|
| # 7 | 10/09 16:16 | To | 10/10 06:04 | 13.79    | RF4 Mod Anode trip[RF] | 0.35 | Investigation, refill
|
| # 8 | 10/10 06:25 | To | 10/13 07:59 | 73.57    | Int Dump: End of Period | 0.00 | |
|
|
|
|   | 0.00 |
|
| # 9 | 10/14 08:00 | To | 10/16 00:01 | 40.02    | RF3 comm.problems [??] | 0.54 | Investigation, refill
|
| # 10 | 10/16 00:33 | To | 10/19 01:51 | 73.30    | RF3 HVPS problem [RF] | 6.14 | Investigation, waveguide switch |
|
|
|
|   | 0.00 |
|
| # 14 | 10/21 08:00 | To | 10/27 07:59 | 144.00    | Int Dump: End of Period | 0.00 |
|
|
|   | 0.00 |
|
| # 15 | 10/28 08:00 | To | 11/02 09:50 | 122.83    | 420RF-PSS trip [RF] | 0.47 | Investigation, refill
|
| # 16 | 11/02 10:18 | To | 11/03 07:59 | 21.70    | Int Dump: End of Period | 0.00 | |
|
|
|
|   | 0.00 |
|
| # 17 | 11/04 08:00 | To | 11/07 14:02 | 78.04    | Fill Ongoing | 0.00 |
|
Top-Up Mode Statistics
Target Current Range +/- 2.0, Minimum Injector Downtime = 8.0 minutes
Total
| Current in Range during Scheduled Topup Time | 97.26 % |
| Current in Range during Delivered Beam Time | 99.93 % |
| Injector Availability | 99.91 % |
| Period Beginning 10/06/2009 08:00 |
| Current in Range | 100.00 % |
| Injector Availability | 100.00 % |
| Period Beginning 10/14/2009 08:00 |
| Current in Range | 100.00 % |
| Injector Availability | 100.00 % |
| Period Beginning 10/21/2009 08:00 |
| Current in Range | 100.00 % |
| Injector Availability | 100.00 % |
| Period Beginning 10/28/2009 08:00 |
| Current in Range | 99.73 % |
| Injector Availability | 99.65 % |
| Out of Range at: | 10/29/2009 20:42:00 | to | 10/29/2009 20:50:32 : | 8.53 minutes |
| Injector downtime: | 10/29/2009 20:37:04 | to | 10/29/2009 20:50:28 : | 13.40 minutes |
| Out of Range at: | 10/31/2009 10:24:16 | to | 10/31/2009 10:38:48 : | 14.53 minutes |
| Injector downtime: | 10/31/2009 10:19:20 | to | 10/31/2009 10:36:40 : | 17.33 minutes |
The information on this page is automatically generated and may contain errors.
An official operations statistics page will be posted at the end of each user period.