Diagnostics Projects: Photon Diagnostics 5-Year Plan

  • Photon Diagnostics Projects Overview - PDF
    Bingxin Yang (March 28, 2008)

  • SR Portable Detector Upgrade @
    Bingxin Yang (March 28, 2008)
    ICMS# APS_1255145
    Category: Beam Stability

  • SR Beam Loss Monitor Upgrade @
    Bingxin Yang (March 28, 2008)
    ICMS# APS_1255147
    Category: Accelerator Hardware and Insertion Device Upgrades

  • SR Photon Monitor Upgrade @
    Bingxin Yang (March 28, 2008)
    ICMS# APS_1255148
    Category: Accelerator Hardware and Insertion Device Upgrades

  • Injector Synchrotron Light Monitor Upgrade
    Bingxin Yang (March 28, 2008) @
    ICMS# APS_1255149
    Category: Accelerator Hardware and Insertion Device Upgrades

  • Three-screen Emittance Measurement for PAR Bypass and Booster BTS @
    Bingxin Yang, Bill Berg (March 28, 2008)
    ICMS# APS_1255150
    Category: Accelerator Hardware and Insertion Device Upgrades

  • SR and Injector Flags Upgrade @
    Bingxin Yang, Bill Berg (March 28, 2008)
    ICMS# APS_1255151
    Category: Obsolescence / Spares

    Modified 7/22/2008 by decker@aps.anl.gov