Machine Studies

Draft Schedule for Run02-12, 2015

August 26th 0000 – Augst 26th 2400



Time

Descriptions

Studiers

SR Status


Wednesday, August 18, 2015



0000-0010

Collect XBPM orbit data

OPS

Stored Beam & Injection

0010-0130

OPEN



0130-0200

Prepare for 48 singlet 150mA study

OPS

No beam

0200-0600

Condition SR using 48 singlets to 150mA.

Harkay, OPS

Stored beam & injection

0600-0800

Condition SR from 25 to 100mA using 24 doublets

Harkay, OPS

Stored beam & injection

0800-1200

Condition SR from 100mA to 150mA using 24 doublets followed by restoring 102mA, 24 singlet fill

Harkay, OPS

Stored beam & injection

1200-1230

demonstrate orbit correction configuration creation problems to IT on Machine Studies workstations

Sereno, IT group

Stored or no beam

1230-1430

Compton XBPM studies (shutter permit required) parasitic

Yang, Sereno

Stored beam & injection

1430-2030

Update XRDP configuration and align selected XBPMS

Sereno

Stored beam & injection

2030-2100

Dump stored beam and bring down SR RF, Linac/PAR RF systems for upcoming RF group test at 21:00

OPS

No beam

2100-2200

evaluate Booster rf system operation after changing the RF Source in A014 by +100 kHz, to approximately 352.027MHz

RF Group

No beam

2200-2400

"Gentle" shutdown

OPS

No beam