Machine Studies
Draft Schedule for Run02-1, 2012
May 23rd 0800 – May 30th 0800
|
Time |
Descriptions |
Studiers |
SR Status |
|
|
Wednesday, May 23, 2012 |
|
|
|
1000-1400 |
BPLD validation. |
Bui |
Stored Beam & Injection |
|
1400-1800 |
X-ray BPM checkout. |
Hahne |
Stored Beam & Injection |
|
1800-2400 |
Initial BPM system checkout. |
Decker Bui |
Stored Beam & Injection |
|
|
Thursday, May 24, 2012 |
|
|
|
0000-0800 |
24 singlets initial lattice setup. |
Sajaev |
Stored Beam & Injection |
|
0800-1200 |
PSS shutter tests |
SI Group |
No Beam |
|
0900-1100 |
MPS validations |
Smith |
No Beam |
|
1200-1800 |
Orbit recovery. |
Xiao |
Stored Beam & Injection |
|
1800-2400 |
Intermediate BPM system checkout. |
Decker Hahne |
Stored Beam & Injection |
|
|
Friday, May 25, 2012 |
|
|
|
0000-0400 |
Coupling minimization using ORM. |
Sajaev |
Stored Beam & Injection |
|
0400-0800 |
Injection studies. |
Sajaev |
Stored Beam & Injection |
|
0800-1600 |
IEX correction coil measurements. |
Xiao |
Stored Beam & Injection |
|
1600-2000 |
X-ray BPM data collection. |
Hahne Decker |
Stored Beam & Injection |
|
2000-2400 |
P1 BPM offset measurements (remote). |
Xiao Sajaev OPS |
Stored Beam & Injection |
|
|
Saturday, May 26, 2012 |
|
|
|
0000-0200 |
P1 BPM offset measurements (continued). |
Xiao Sajaev OPS |
Stored Beam & Injection |
|
0200-1000 |
OPEN |
|
|
|
1000-1400 |
RHB lattice setup. |
Xiao |
Stored Beam & Injection |
|
1400-1700 |
P5 BPM offset measurements (remote). |
Xiao OPS |
Stored Beam & Injection |
|
1700-2400 |
P2 BPM offset measurements (remote). |
Xiao OPS |
Stored Beam & Injection |
|
|
Sunday, May 27, 2012 |
|
|
|
0000-0800 |
OPEN |
|
|
|
0800-1200 |
Booster ORM measurements. |
Yao |
Stored Beam & Injection |
|
1200-1800 |
CPU checkout 1. |
Xiao |
Stored Beam & Injection |
|
1800-2200 |
Top-up test run. |
OPS |
Stored Beam & Injection |
|
2200-2400 |
6BM steering vs vacuum and temperature. |
Harkay Boon |
Stored Beam & Injection |
|
|
Monday, May 28, 2012 |
|
|
|
0000-0400 |
6BM steering vs vacuum and temperature (continued). |
Harkay Boon |
Stored Beam & Injection |
|
0400-0800 |
OPEN |
|
|
|
0800-1400 |
CPU checkout 2. |
Xiao |
Stored Beam & Injection |
|
1400-1700 |
375 MeV injector setup. |
Yao Sereno |
Stored Beam & Injection |
|
1700-2100 |
Tune slopes with 24 singlets. |
Harkay Boon |
Stored Beam & Injection |
|
2100-2400 |
OPEN |
|
|
|
|
Tuesday, May 29, 2012 |
|
|
|
0000-0600 |
4NLSS lattices recovery. |
Sajaev |
Stored Beam & Injection |
|
0600-0800 |
S35BM pinhole setup for user run. |
Yang |
Stored Beam & Injection |
|
0800-1000 |
S35ID/S36AM bunch purity monitor setup for user run. |
Yang |
Stored Beam & Injection |
|
1000-1200 |
SR closed-loop tune measurement test. |
Yao Shang |
Stored Beam & Injection |
|
1200-1600 |
Final BPM system checkout. |
Decker Hahne |
Stored Beam & Injection |
|
1600-2400 |
IEX main coil low current test. |
Xiao |
Stored Beam & Injection |
|
|
Wednesday, May 30, 2012 |
|
|
|
0000-0300 |
Hybrid lattice setup. |
Sajaev |
Stored Beam & Injection |
|
0300-0600 |
Final lattice and injection setup. |
Sajaev |
Stored Beam & Injection |
|
0600-0800 |
Prepare for user Operations (24 singlets – Top-Up) |
Ops |
Stored Beam & Injection |