Storage Ring Studies Schedule
Monday, April 1st – Tuesday, April 9th




Monday, April 01
Time Study Studiers Notes
09:00-19:00 RF Noise Suppression Test and Check Out / Waveguide Phase Measurements RF Group
07:00-17:00 M1/M2 Power Supply Testing and Checkout PS Group
07:00-17:00 Unipolar PS DCCT glitching investigation PS Group
XX:XX Possible Software Permissive Testing Borland/PS Group
XX:XX MRF integrated TNC R. Hong
XX:XX DAQ post-mortem integration testing Arnold/E. Chandler/W. Cheng Requires Libera bpm electronics
13:00-17:00 MPS Local validation M. Smith/H. Bui




Tuesday, April 02
Time Study Studiers Notes
07:00-17:00 MPS Local validation M. Smith/H. Bui
07:00-16:00 M1&M2 power supply testing PS Group
07:00-16:00 Troubleshoot S35A:Q6 failing software permissive PS Group
09:00-17:00 Finish MRF integrated TNC R. Hong
09:00-17:00 DAQ post-mortem integration testing (combined with Inj. Timing integration as needed) Arnold/E. Chandler/W. Cheng
10:00-12:00 Switch RF source to IETS, start up RF1 with IETS source RF Group
10:00-12:00 RF1 source noise hunting T. Berenc
10:00-15:00 Fan out kicker IOC checkout

12:00-19:00 RF1 Noise Suppression Test and Check Out T. Berenc
13:00-17:00 Injection Timing Integration Studies (combined with DAQ integration testing as needed) Carwardine et al Requires Booster beam extraction
15:00-16:00 MPS event trigger test with MRF and DAQ M. Smith/H. Bui/R. Hong/N. Arnold
16:00-19:00 Software permissive validation with all unipolars and M1&M2 Borland/PS Group




Wednesday, April 03
Time Study Studiers Notes
07:00-08:00 Prepare for Zone F access MCR
08:00-10:00 Zone F access to repace S40 blower and/or air hose MOM
08:00-10:00 Replace filters in water system P-RF3 MOM RF3 off
10:00-11:00 Recover from Zone F access MCR
08:00-12:00 Main MPS DCCT chassis – installl fix for low-current readbacks D. Paskvan
09:00-15:00 Finish fan out kicker ioc checkout I. Abid/B. Chandler
09:00-17:00 DAQ post-mortem integration testing (combined with Inj. Timing integration as needed) N. Arnold/E. Chandler/W. Cheng
10:00-16:00 Cool down BLS Fuerst/Wienands
10:00-16:00 M1/M2 DCCT noise investigation J. Wang
10:30-16:00 29-ID IEX MPS hook-up and validation M. Smith/H. Bui/PSG/Budz
12:00-19:00 Finish RF1 Noise Suppression Test and Check Out T. Berenc
13:00-17:00 Injection Timing Inegration Studies / waveform monitoring J. Calvey/J. Carwardine/D. Paskvan/T. Fors Requires Booster beam extraction
15:00-16:00 MPS event trigger test with DAQ M/ Smith/H. Bui/R. Hong/N. Arnold




Thursday, April 04
Time Study Studiers Notes
10:00-14:00 RF4 waveguide phase adjustments RF Group
10:00-11:00 SR PEM power supply testing R. Soliday
14:00-15:00 Retest DAQ with MPS event triggering N.Arnold/H. Bui
15:00-17:00 Main MPS validation M. Smith/MCR After completion of RF checkout




Friday, April 05
Time Study Studiers Notes
07:00-15:00 Install 120V AC power to M1/M2 relay rack Scheck
08:00-12:00 Complete Main MPS validation M. Smith/MCR if needed
12:00-13:00 IEX polarity check PS Group After MPS validations, Zone E in CA
13:00-15:00 Rack out Zones A-E FAC
13:00-14:00 Re-take data from IK timing sync Carwardine et al Requires Booster beam extraction




Saturday, April 06
Time Study Studiers Notes
























Sunday, April 07
Time Study Studiers Notes
























Monday, April 08
Time Study Studiers Notes
07:00-10:00 Final walkthroughs of Zones A-E

07:00-08:00 Prepare for Booster access MCR
08:00-08:30 Booster access to remove HET stop LOTO Hoyt/Lenner/MCR
08:30-09:30 Recover from Booster access MCR
10:00-11:00 Secure Zones A-E MCR
11:00-11:30 M1 Dipole ACIS shutdown validation MCR/PS Group
12:00-16:00 ACIS live tests MCR & Others








Tuesday, April 09
Time Study Studiers Notes
08:00-10:00 BEFI chassis work G. Bruno/R. Keane Booster dipole ramp off




















Wednesday, April 10
Time Study Studiers Notes
12:00-18:00 BEFI re-installation and validation G. Bruno/R. Keane