Storage Ring Studies Schedule |
Monday, April 1st – Tuesday, April 9th |
|
|
|
|
Monday, April 01 |
Time |
Study |
Studiers |
Notes |
09:00-19:00 |
RF Noise Suppression Test and Check Out / Waveguide Phase Measurements |
RF Group |
|
07:00-17:00 |
M1/M2 Power Supply Testing and Checkout |
PS Group |
|
07:00-17:00 |
Unipolar PS DCCT glitching investigation |
PS Group |
|
XX:XX |
Possible Software Permissive Testing |
Borland/PS Group |
|
XX:XX |
MRF integrated TNC |
R. Hong |
|
XX:XX |
DAQ post-mortem integration testing |
Arnold/E. Chandler/W. Cheng |
Requires Libera bpm electronics |
13:00-17:00 |
MPS Local validation |
M. Smith/H. Bui |
|
|
|
|
|
Tuesday, April 02 |
Time |
Study |
Studiers |
Notes |
07:00-17:00 |
MPS Local validation |
M. Smith/H. Bui |
|
07:00-16:00 |
M1&M2 power supply testing |
PS Group |
|
07:00-16:00 |
Troubleshoot S35A:Q6 failing software permissive |
PS Group |
|
09:00-17:00 |
Finish MRF integrated TNC |
R. Hong |
|
09:00-17:00 |
DAQ post-mortem integration testing (combined with Inj. Timing integration as needed) |
Arnold/E. Chandler/W. Cheng |
|
10:00-12:00 |
Switch RF source to IETS, start up RF1 with IETS source |
RF Group |
|
10:00-12:00 |
RF1 source noise hunting |
T. Berenc |
|
10:00-15:00 |
Fan out kicker IOC checkout |
|
|
12:00-19:00 |
RF1 Noise Suppression Test and Check Out |
T. Berenc |
|
13:00-17:00 |
Injection Timing Integration Studies (combined with DAQ integration testing as needed) |
Carwardine et al |
Requires Booster beam extraction |
15:00-16:00 |
MPS event trigger test with MRF and DAQ |
M. Smith/H. Bui/R. Hong/N. Arnold |
|
16:00-19:00 |
Software permissive validation with all unipolars and M1&M2 |
Borland/PS Group |
|
|
|
|
|
Wednesday, April 03 |
Time |
Study |
Studiers |
Notes |
07:00-08:00 |
Prepare for Zone F access |
MCR |
|
08:00-10:00 |
Zone F access to repace S40 blower and/or air hose |
MOM |
|
08:00-10:00 |
Replace filters in water system P-RF3 |
MOM |
RF3 off |
10:00-11:00 |
Recover from Zone F access |
MCR |
|
08:00-12:00 |
Main MPS DCCT chassis – installl fix for low-current readbacks |
D. Paskvan |
|
09:00-15:00 |
Finish fan out kicker ioc checkout |
I. Abid/B. Chandler |
|
09:00-17:00 |
DAQ post-mortem integration testing (combined with Inj. Timing integration as needed) |
N. Arnold/E. Chandler/W. Cheng |
|
10:00-16:00 |
Cool down BLS |
Fuerst/Wienands |
|
10:00-16:00 |
M1/M2 DCCT noise investigation |
J. Wang |
|
10:30-16:00 |
29-ID IEX MPS hook-up and validation |
M. Smith/H. Bui/PSG/Budz |
|
12:00-19:00 |
Finish RF1 Noise Suppression Test and Check Out |
T. Berenc |
|
13:00-17:00 |
Injection Timing Inegration Studies / waveform monitoring |
J. Calvey/J. Carwardine/D. Paskvan/T. Fors |
Requires Booster beam extraction |
15:00-16:00 |
MPS event trigger test with DAQ |
M/ Smith/H. Bui/R. Hong/N. Arnold |
|
|
|
|
|
Thursday, April 04 |
Time |
Study |
Studiers |
Notes |
10:00-14:00 |
RF4 waveguide phase adjustments |
RF Group |
|
10:00-11:00 |
SR PEM power supply testing |
R. Soliday |
|
14:00-15:00 |
Retest DAQ with MPS event triggering |
N.Arnold/H. Bui |
|
15:00-17:00 |
Main MPS validation |
M. Smith/MCR |
After completion of RF checkout |
|
|
|
|
Friday, April 05 |
Time |
Study |
Studiers |
Notes |
07:00-15:00 |
Install 120V AC power to M1/M2 relay rack |
Scheck |
|
08:00-12:00 |
Complete Main MPS validation |
M. Smith/MCR |
if needed |
12:00-13:00 |
IEX polarity check |
PS Group |
After MPS validations, Zone E in CA |
13:00-15:00 |
Rack out Zones A-E |
FAC |
|
13:00-14:00 |
Re-take data from IK timing sync |
Carwardine et al |
Requires Booster beam extraction |
|
|
|
|
Saturday, April 06 |
Time |
Study |
Studiers |
Notes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sunday, April 07 |
Time |
Study |
Studiers |
Notes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Monday, April 08 |
Time |
Study |
Studiers |
Notes |
07:00-10:00 |
Final walkthroughs of Zones A-E |
|
|
07:00-08:00 |
Prepare for Booster access |
MCR |
|
08:00-08:30 |
Booster access to remove HET stop LOTO |
Hoyt/Lenner/MCR |
|
08:30-09:30 |
Recover from Booster access |
MCR |
|
10:00-11:00 |
Secure Zones A-E |
MCR |
|
11:00-11:30 |
M1 Dipole ACIS shutdown validation |
MCR/PS Group |
|
12:00-16:00 |
ACIS live tests |
MCR & Others |
|
|
|
|
|
|
|
|
|
Tuesday, April 09 |
Time |
Study |
Studiers |
Notes |
08:00-10:00 |
BEFI chassis work |
G. Bruno/R. Keane |
Booster dipole ramp off |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wednesday, April 10 |
Time |
Study |
Studiers |
Notes |
12:00-18:00 |
BEFI re-installation and validation |
G. Bruno/R. Keane |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|