Injector Studies 

April 15th, 0800 - April 28th, 0800.

Wednesday, 04/15/2015
Time
Description
Studiers
Comments
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-1500
RG2 matching.
Y. Sun, S. Pasky, J. Dooling
Linac Access for laser alignment.
APS_1192865
0900-1100
Test booster ramp firing card 60Hz sync clock source selection T. Puttkammer
CY Yao, Ju Wang.
Need to shutdown the booster BM
1500-1900
Test booster new BPM H. Bui, T. Pietryla
CY Yao.

1900-2000
Injector Recovery/SR Fill 
OPS
324 Singlets
2000-2400
RG1 matching.

Y. Sun, J. Dooling


          Thursday, 04/16/2015  (X) 1/2 day   
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0700
Operator Training
E. Smith
2 HRS.
0000-0700
Slowly elevate and maintain 70MeV SLED Power on L4 and L5. OPS
Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-1130
Optimize the Linac rf timing to compensate for the conversion to solid state switches in the modulator.
A. Grelick, Hengjie Ma, S. Pasky
Verify K2 Dwn Mode if time is available.
1130-1500RG2 matching
Y. Sun, J. Dooling
 
1500-1900
Test booster new BPM H. Bui, T. Pietryla
CY Yao

1900-2000
Injector Recovery/SR Fill 
OPS
324 Singlets

2000-2400

RG1 matching.

Y. Sun J. Dooling


Friday, 04/17/2015 (X) Full day
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0700
Operator Training
E. Smith
2 HRS.
0000-0700
Slowly elevate and maintain 80MeV SLED Power on L4 and L5.
OPS
Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-1200
Measure booster charge dependent tune shift. CY YAO
Need stable Beam
1200-1500BTS Quads Beam Offset measurements and Adjustment. CY YAO, Aimin Xiao, H. Shang

1500-1900
Optimize booster efficiency with linear chromaticity SD/SF ramp.  CY YAOBeam Operations
1900-2000
Injector Recovery/SR Fill 
OPS
324 Singlets
2000-2400
Slowly elevate and maintain 80MeV SLED Power on L4 and L5.
OPS
Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
Saturday, 04/18/2015 (X)
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0700
Slowly elevate and maintain 90MW SLED Power on L4 and L5.
OPS
Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-1900
Maintain 90MW SLED power on L4 and L5.
OPS
Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
1900-2000
Injector Recovery/SR Fill 
OPS
324 Singlets
2000-2400
Maintain 90MW SLED power on L4 and L5.
OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
Sunday, 04/19/2015 (X)
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0700 Maintain 90MW SLED power on L4 and L5.
OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-1900
Maintain 90MW SLED power on L4 and L5.
OPSMonitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
1900-2000
Injector Recovery/SR Fill 
OPS
324 Singlets
2200-2400
Maintain 90MW SLED power on L4 and L5. OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
Monday, 04/20/2015 
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0700 Maintain 90MW SLED power on L4 and L5. OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-1200
PAR ion effect investigation.
CY Yao, K. Harkay, J. Calvey
MOM Group to turn off PAR ion pumps.
Contact Mark Martens.
1200-1600
Radiation SurveyCY Yao, J. VaccaBooster Controlled Access for Rad Measurements. WR 35283
1600-1900
Main ramp correction program test. H. Shang, CY YAO Beam
1900-2000 Injector Recovery/SR Fill
OPS
324 Singlets
2000-2400
RG1 Kicker Validation
S. Pasky
Validation of Thermionic RF Gun Kicker Systems APS_1193604
Tuesday, 04/21/2015
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0700 Maintain 100MW SLED power on L4 and L5. OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/Machine Studies  OPS

0800-0000
Machine Studies Period
Wednesday, 04/22/2015
Time
Description
Studiers
Comments
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-1600
PCGun Beam
Y. Sun, J. Dooling,
Install focusing optics for cathode cleaning and realign the laser onto the photocathode.

APS Linac/PAR ACIS Interlock Bypass to Support In-Tunnel APS Photoinjector Drive Laser Alignment.
APS_1192865
1600-1900
RG2 Beam Operation
OPS
Possible RG2 Kicker Validation. S.Pasky
1900-2000 Injector Recovery/SR Fill  OPS
324 Singlets
2000-2400
RG2 Kicker Validation
S.Pasky
Validation of Thermionic RF Gun Kicker Systems APS_1193604
Thursday, 04/23/2015
Time
Description
Studiers
Comments - RF Conditioning Guide
2400-0400
BTS Line Measurements
A. Xiao

0000-0700 Maintain 100MW SLED power on L4 and L5. OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/SR Fill OPS
324 Singlets
0800-1900
PCGun Beam Operation
Y. Sun, J. Dooling, S. Pasky
Install focusing optics for cathode cleaning and realign the laser onto the photocathode.

APS Linac/PAR ACIS Interlock Bypass to Support In-Tunnel APS Photoinjector Drive Laser Alignment.
APS_1192865
1900-2000 Injector Recovery/SR Fill 
OPS
324 Singlets
2000-2400
Maintain 100MW SLED power on L4 and L5. OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
Friday, 04/24/2015
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0400
BTS Line Measurement
A. Xiao

0400-0700 Maintain 100MW SLED power on L4 and L5. OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-0900
Fast diode bunch length measurement CY Yao, B.Yang

0900-1900
PCGun/RG2 Operation
Y. Sun, S.Pasky
1900-2000 Injector Recovery/SR Fill 
OPS
324 Singlets
2000-2400
Maintain 100MW SLED power on L4 and L5.
OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
Saturday, 04/25/2015
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0700 Maintain 100MW SLED power on L4 and L5.
OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-1900
Maintain 100MW SLED power on L4 and L5.
OPS

1900-2000 Injector Recovery/SR Fill 
OPS
324 Singlets
2200-2400
Maintain 100MW SLED power on L4 and L5. OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
Sunday, 04/26/2015
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0700 Maintain 100MW SLED power on L4 and L5.
OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-1900
Maintain 100MW SLED power on L4 and L5.
OPSMonitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
1900-2000 Injector Recovery/SR Fill 
OPS
324 Singlets
2200-2400
Maintain 100MW SLED power on L4 and L5.

OPS

Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
Monday, 04/27/2015
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0700
Maintain 100MW SLED Power on L4 and L5.
OPS
Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0700-0800 Injector Recovery/SR Fill 
OPS
324 Singlets
0800-1900
ITS Gun Testing
Y. Sun, S. Pasky
1900-2000
Injector Recovery/SR Fill 
OPS
324 Singlets
2000-2400
Maintain 100MW SLED Power on L4 and L5. OPS Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
Tuesday, 04/28/2015
Time
Description
Studiers
Comments - RF Conditioning Guide
0000-0700
Maintain 100MW SLED Power on L4 and L5. OPS
Monitor vacuum at L5:TW:VP:CO8, possible internal water leak on L5:AS3:WL water load. If vacuum pressure increases to 10e-7, stop conditioning L5.
0800-0000

Machine Studies Period