Draft Schedule for Run02-7, 2017

July 10th 0800 - July 11th 0800



Time

Descriptions

Studiers

SR Status


Monday, July 10, 2017



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1130

Remove the HV power supply in SR AK0 Kicker power supply for repair

Vanis

No impact

0930-1300

Further investigate noise and erratic readbacks from Booster Extraction interlock system

RF Group

No injection

Possible Booster Access

0930-1130

Investigate blown Dump fuses in SR Raw T2 in sector 26:27

Vargas

No beam

0930-1230

replace a Metasys switch in Auditorum network closet -- May trip pump 405 (S1&2) off

Westbrook

No beam

0930-1130

Swap sextupoles for upgrades in Zone B

VargasAckley

No Beam

1000-1130

Replace S38 RF cavity blower

Pace/McKenzie

Zone F Access

1000-1130

Replace S38 Cav.3 Limit Switch and/or cable

RF Group

Zone F Access

1030-1230

Investigate S23 water leak

Bechtold

Zone D access

1000-1100

Switch from RF1 to RF4

RF Group

No beam

1230-1600

PAR setup (1st hour or two) and Measure booster chrom and disp, and optimize on-momentum injector efficiency. Need to change rf frequency

Yao, Lenkzsus

No beam

1300-1500

Investigate why SR sector2AV3 converter DAC read-back is dropping out

Jordan

No beam

1600-1800

Test BPLD script

Sereno/Shang

Stored beam & injection

1800-1900

Test FPGA bpm configuration for hybrid

Sereno/Shang

Stored beam & injection

1900-2300

Orbit Switch to 324 singlets

Xiao

Stored beam & injection

2300-2400

hybrid mode robustness to parameters

Emery/Sajaev

Stored beam & injection


Tuesday, June 13, 2017



0000-0200

hybrid mode robustness to parameters (continued)

Emery/Sajaev

Stored beam & injection

0200-0600

orbit stability and AC response matrix measurement

Sajaev

Stored beam & injection

0630-0800

Add back bpms removed during hybrid to orbit control configuration (parasitic to preparing for User beam)

Sereno

Stored beam & injection

0630-0800

Prepare for User beam (324 singlets)

OPS

Stored Beam & Injection