Machine Studies
Draft Schedule for Run02-3, 2017
June 12th 0800 - June 13th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 12, 2017 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0930 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0930-0950 |
Investigate abort kicker timing (S39 flag and RF conditioning key insertion after this is complete) |
Lenkzsus |
No Beam |
0930-1000 |
Reboot interleaving DSPs |
PS Group/OPS |
No Injection |
0930-1000 |
replace the TC module in the PLC for RF5 |
Rf Group |
No injection |
0930-1030 |
Update LNDS PLC code |
Smith |
Stored Beam & Injection |
0930-1130 |
Take output bridge current measurements |
Vargas |
No Beam |
0930-1030 |
Shut down L5 and replace the leaking water hose |
RF Group/ MOM Group |
No injection |
0930-1130 |
Swap sextupoles for upgrades |
Ackley |
No Beam |
0930-1130 |
Upgrade 24V supply in L3 rack |
Donkers |
No Injection |
1000-1100 |
Inspect S27 bellows |
Gagliano |
Access Zone D |
1130-1200 |
Recover injectors/SR |
OPS |
Stored beam & injection |
1200-1400 |
Test 1Hz PAR with 16 linac bunches. PAR beam only. |
Yao, Lenkszus, Pietryla |
No injection |
1400-1500 |
test 1Hz Booster BPM operation |
Yao, Pietryla |
No injection |
1500-1700 |
install and test modifications to the Linac modulator databases. (injection will be unavailable at end of studies) |
Pietryla |
Occassional injection |
1500-1700 |
BPM testing |
Sereno |
Stored beam |
1700-1900 |
BPLD validation script testing |
Sereno/Shang |
Stored beam & injection |
1900-2300 |
PAR/booster high charge studies (1 Hz mode, no SR injection) |
Calvey, Dooling, Berenc |
No injection |
2300-2400 |
response matrix accuracy study |
Sajaev |
Stored beam & injection |
|
Tuesday, June 13, 2017 |
|
|
0000-0300 |
response matrix accuracy study (continued) |
Sajaev |
Stored beam & injection |
0300-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |