Machine Pre-Studies

Schedule for Run03-1, 2016

Sep 23rd 0800 – Oct. 4th 0800

Time

Descriptions

Studiers

SR Status


Fri, Sep 23, 2016 (Pre-Studies)



0800-1000

MPS validations, final checkout

Smith


1200-1400

Establish injection.

Schroeder,

Sajaev

Stored Beam & Injection

1400-1600

Aperture scan, ID6 SCU(18-2) chamber, 15 mA in many bunches.

Emery, Sajaev

Stored Beam & Injection

1600-2000

Beam-based alignment, ID6 and ID1 scan, 24 bunches < 25 mA.

Harkay

Stored Beam & Injection

1700-1900

Realign ID6 SCU chamber if needed (could be postponed to Mon, Sep 26).

Jansma et al.

Access Zone A

2000-2300

Beam-based alignment, BM6 scan, 324 bunches < 25 mA.

Harkay

Stored Beam & Injection

2300-2400

Rf conditioning, 115 mA, 24 bunches.

Measure x,y tunes at intervals of 5 mA.

No P0 FB.

OPS

Stored Beam & Injection


Sat, Sep 24, 2016 (Pre-studies)



0000-1500

Rf conditioning, 115 mA, 24 bunches.

Measure x,y tunes at intervals of 5 mA.

No P0 FB.

OPS

Stored Beam & Injection

1500-1900

Accumulate 100 mA, 24 bunches, ID6 SCU powered

Harkay

Stored Beam & Injection

1900-2100

Beam dump test, ID6 SCU off and powered, with and without abort kicker

Harkay

Stored Beam & Injection

2100-2400

Open




Sun, Sep 25, 2016 (Pre-studies)



0000-0400

Quench test, ID6 SCU powered

Emery

Stored Beam & Injection

0400-1300

Open



1300-1600

ID6 BLM calibration

Dooling, Harkay

Stored Beam & Injection

1600-2400

Open




Mon, Sep 26, 2016 (Pre-studies)



0000-0800

Open



0800-1200

Beam perturbation and field integrals test for ID6 SCU

Emery/Sajaev

Stored Beam & Injection

1200-1600

Orbit control tests ID6

Emery/Sajaev

Stored Beam & Injection

1600-2400

Open




Tuesday, Sep 27, 2016 (Pre-studies end at 08:00)



0000-0800

Open