Machine Studies

Draft Schedule for Run03-10, 2014

December 2nd 0800 – December 3rd 0800

Time

Descriptions

Studiers

SR Status


Tuesday, December 02, 2014



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder/

OPS

Stored Beam & Injection

0930-1130

Swap out old quad converters S8/9

Vargas

No Beam

0930-1130

Measure water flows in Zone B

Goetzen

No Beam

0930-1130

Work on AHUs in S3/4, 5/6, 7/8 & 37/38

FMS

Stored Beam & Injection

0930-1230

Install blanking in RF test stand

RF Group

No Beam

0930-1230

Investigate RF-4 instability

Trento

No Beam

1000-1400

Modify SCU0 helium volume

Hasse, Kasa

Access Zone A

1030-1330

PC gun laser alignment

Dooling

Access Linac

1400-1500

Injector training (07-15)

Frausto

Limited Injection

1500-1600

test SR chromaticity measurement script. store beam with 24 or 324 bunches. Need to scan rf frequency

Yao/Shang

Stored beam & injection

1600-1800

continue accumLimit P0feedback power study. Hybrid lattice. Single bunch injection

Yao

Stored beam & injection

1800-2000

unified feedback studies

Sereno

Stored beam & injection

2000-2200

Libera P0 studies

Sereno

Stored beam & injection

2200-2400

Set up square matrices

Sereno

Stored beam & injection


Wednesday, December 03, 2014



0000-0100

SR training (23-07)

Angel

Stored Beam & Injection

0100-0500

orbit switch

Xiao

Stored beam & injection

0500-0700

Punch down S7B:H4/B4

Xiao

Stored Beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection