Machine Studies

Schedule for Run02-5, 2012

June 25th 0800 - June 27th 0800



Time

Descriptions

Studiers

SR Status


Monday, June 25, 2012



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0930

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0930-1330

Investigate IEX earth coil trips, resets, etc.

Deriy, Xiao, M. Smith

No beam

0930-1600

Install temporary chiller in Bldg. 420 (no AC in 420, all Booster/BTS P.S. off, SR Dipole off, affected pumps off, all 420 RF systems off)

FMS

No beam

0930-1230

change S Vacuum skid valves in sectors 13-14 and 39-40

Putnam

No beam

0930-1230

Swap out S26B:V2 & S21B:S2 P.S.

Putkammer

No beam

0930-1130

Install a fiber cable from A014 to S2 DG rack

Gold

No impact

0930-1330

Repair the reflected power meter on Harmonic amplifier #1, and test the system into the cavity

T. Smith

No beam

0930-1600

Troubleshoot SR Tunnel AHU for Sectors 5/6, 7/8,

Kailus/Erwin

No impact

0930-1330

Investigate PAR Septum needing setpoint entered twice

Hillman

No beam

0930-1330

investigate S40A:Q5's read backs and

Investigate sector 2:3's loss of communication.

Puttkammer

No beam

0930-1330

Pre-mount the hardware for the magnet interlocks for the Linac correctors

Hillman

No beam

1600-1800

Temperature recovery and recover Booster systems/420 RF systems

OPS/multiple groups

Stored Beam & Injection

1800-2100

Damping time scan.

Yao

Stored Beam & Injection

2100-2200

Set up P0 feedback for hybrid.

Yao

Stored Beam & Injection

2200-2400

Complete hybrid lattice setup.

Sajaev

Stored Beam & Injection


Tuesday, June 26, 2012



0000-0200

Complete hybrid lattice setup (continued).

Sajaev

Stored Beam & Injection

0200-0600

Orbit switch.

Xiao

Stored Beam & Injection

0600-0900

Investigate linac timing issues.

Pietryla

Injection available

0900-1000

Tune PAR RF12 tuner output offset.

Yao

PAR beam

0600-1000

Investigate IEX earth coil trips, resets, etc.

Deriy, Xiao, M. Smith

No beam

1000-1200

FPGA data collection.

Wang

Stored Beam & Injection

1200-1400

Tune up 375 MeV injection.

Sereno Emery

Stored Beam & Injection

1400-1500

Test P0 amplifier EPICS Pvs.

DiMonte

Stored Beam & Injection

1500-2100

IEX commissioning.

Xiao

Stored Beam & Injection

2100-2300

Start 4NLSS+RHB lattice work.

Xiao

Stored Beam & Injection

2300-2400

Continue 4NLSS+RHB lattice work.

Sajaev

Stored Beam & Injection


Wednesday, June 27, 2012



0000-0300

4NLSS+RHB work (continued).

Sajaev

Stored Beam & Injection

0300-0630

Injection studies.

Sajaev

Stored Beam & Injection

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection