Schedule for Run02-13, 2012

August 23th 0800 – August 24th 0000



Time

Descriptions

Studiers

SR Status

 

Thursday, August 23, 2012

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1000

Prepare for high current studies

OPS/Floor coordinators

No Beam

1000-1600

High current studies with shutters open

OPS

Stored Beam & Injection

1600-1615

Recover from high current studies and prepare for other studies

OPS

Stored Beam & Injection

1615-1700

Set up BLM device in 6-ID.

Dooling

Stored Beam & Injection

1700-1800

Measure BPM noise floor in 24 singlets

Lill

Stored Beam & Injection

1700-1800

Test 6-ID BLM device (parallel to BPM noise).

Dooling

Stored Beam & Injection

1800-2000

Measure bunch length as a function of single bunch current

Harkay Yang

Stored Beam & Injection

2000-2200

Test minimum possible number of orbit correctors.

Emery

Stored Beam & Injection

2200-2400

Gentle shutdown

OPS