Machine Studies

Draft Schedule for Run03-5, 2010

November 2nd 0800 – November 3rd 0800

Time

Descriptions

Studiers

SR Status


Tuesday, November 02, 2010



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0900-1000

Phase noise measurements RF3 & 4

Horan

No Beam

0900-1000

Troubleshoot Linux NFS problem

Sersted

Stored Beam & Injection

0900-1000

Reconnect bitbus fiber link to iocs35vp

Stein

No Beam

0900-1000

Take measurements in PAR RF-1 #2

Smith

Limited Injection

0900-1100

Investigate S29/30 NbBPM glitches

Diag

No beam

0900-1000

Investigate S12C:H1 :V1 control hardware

Wang

No beam

0900-1100

Update firmware for S38 FPGA based
MpBPM.

Bui

No Beam

1000-1100

PAR requalifications

Pasky/??

Limited injection

1100-1130

Check reboot of RF IOCs

DiMonte

Stored beam

1130-1300

Investigate unexpected behavior of quads and sextupole during SCR ramp/Investigate DownDoubleSector PEM

Schroeder

Stored beam & inj.

1300-1700

Hybrid lattice adjustments

Sajaev

Stored beam & injection

1700-2100

APS-U lattice

Sajaev

Stored beam & inj.

2100-2300

P0 feedback with reduced chromaticity for hybrid pattern

Yao


2300-2400

Optimize Booster Tune Waveforms

Yao

Occ. Injection available

2300-2400

CPU study

Xiao

Stored Beam Occ. Inj.


Wednesday, November 03, 2010



0000-0300

Optimize Booster Tune Waveforms

Yao

Occ. Injection available

0000-0300

CPU Study

Xiao

Stored beam & occ. inj

0300-0700

Gas bremsstrahlung (GB) studies in sector 35

Dooling/Yang

Stored beam & inj.

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection