Machine Studies

Draft Schedule for Run03-4, 2010

October 26th 0800 - October 27th 0800

Time

Descriptions

Studiers

SR Status


Monday, October 25, 2010



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0900-0930

Remove phase shifter board from RF1

RF group

Stored Beam

0900-1100

Measure B:BM ouput voltage

Feng

No Injection

0900-1200

Troubleshoot PAR RF-1

RF group

Limited Injection

0900-1200

Replace leaking RF5 mod-anode oil pump

RF group

No Injection

0930-1130

Investigate inconsistent S12C:BM:PS voltage and current readbacks

Fors

No Beam

0930-1000

Waveguide switch to RF3

RF group

No Beam

0930-1130

Fix iocmps Event Receiver problem

Laird

No Beam

1000-1100

Switch rebuilt pumps P-505, P-525, P-531 to lead pump operation. (all affected P.S. set to 0 - WR#. 28008)

Bracken

No beam

1200-1400

Linac training (09-15)

Schewe

Limited Injection

1200-1400

Test Restore normal chromaticity PEM and 12-ID Canted undulator steering

Schroeder

Stored beam

1400-1600

investigate the monopulse bsp-100 absence of MPS dump trigger

Decker/Bui

Stored beam & inj.

1600-1800

Investigate reboot issues with RF IOCs

DiMonte

Stored beam & inj.

1800-2100

test smooth ramp for booster magnet supplies

Yao

Limited injection

2100-2400

Set-up hybrid

Sajaev, Xiao

Stored beam & inj.


Tuesday, October 26, 2010



0000-0400

Switch orbit

Xiao

Stored beam & inj.

0400-0700

OPEN



0700-0900

Linac training (07-15)

Schewe

Limited Injection

0900-0930

Prepare for Linac Access

OPS

No injection

0930-1130

Remove RG1 cradle

Gagliano, Hoyt, Pasky

Linac Access

1130-1200

Recover from Linac Access

OPS

No injection

1200-1400

Set up P0 feedback and test tune measurement for hybrid pattern

Yao

Stored beam & inj.

1400-1800

Study APS-U lattice

Sajaev/Xiao

Stored beam & inj.

1800-2200

study the correlation between beam steering and scraper temperature

Harkay/ Xiao/Chae

Stored beam & occ. inj.

2200-2400

CPU AC study

Xiao

Stored beam & inj.


Wednesday, October 27, 2010



0000-0200

CPU AC study

Xiao

Stored beam & inj.

0200-0630

OPEN



0630-0800

Prepare for User beam

OPS

Stored Beam & Injection