Machine Studies

Draft Schedule for Run03-11, 2010

December 14h 0800 - October 15th 0800

Time

Descriptions

Studiers

SR Status


Tuesday, December 14, 2010



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0900-1100

Troubleshoot BTS:BQ3

Donkers

No Injection

0900-1300

Replace RF-1 klystron

Horan

No Beam or Injection

0930-1030

Install Cerenkov detectors

Yang/Brill

Access Zone A

1100-1200

Install BTS BLM TLDs

Erwin

Access Booster

1230-1430

BTS BLM measurements

Yang/Dooling

Beam to Booster

1300-1630

RF parallel operations

Berenc

No Beam

1500-1600

Remove BTS BLM TLDs

Erwin

Access Booster

1630-1800

Gather FPGA BPM data (single bunch)

Wang, C.

Stored Beam & inj.

1800-2200

Cerenkov beam loss monitor study (hybrid or 24 singlets 100 mA)

Yang

Stored beam & occ. inj.

1800-2100

Collect data for NbBPM with synchronous timing. Hybrid fill pattern

Lill/Bui/Sun

Stored beam & occ. inj.

2200-2400

Low alpha lattice

Chae, Xiao, Sajaev

Stored beam & injection


Wednesday, December 15, 2010



0000-0100

Low alpha lattice (continued)

Chae, Xiao, Sajaev

Stored beam & injection

0100-0400

APS-U lattice study

Chae, Xiao, Sajaev

Stored beam & injection

0400-0700

test Topup injection into the SR with PAR running at 1 Hz

Lenkszus/Yao/ Sajaev

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection