Machine Studies

Schedule for Run03-10, 2010

December 7th 0800 – December 8th 0800

Time

Descriptions

Studiers

SR Status


Tuesday, December 07, 2010



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/

OPS

Stored Beam & Injection

0900-1030

Removal of waveguide blanking plate at flange RFTS118

Horan

No Beam

0930-1000

End to end test of 23ID

Forrestal

No Beam

0930-1030

Troubleshoot 9BM PS2 Close Switch Fail

Banks

Access Zone B

0930-1130

Install BLM near BTX dump

Erwin

Access Booster

1030-1300

Phase noise measurements in parallel

Horan

No Beam

1200-1300

Add hardware in iocs19bpm (powered down) for narrowband synchronous timing study

Lenkszus

No beam

1300-1600

Collect data for Narrowband BPMs with synchronous timing for hybrid fill pattern.

Bui

Stored beam & inj.

1300-1600

Test new booster ramp correction script

Yao

Injection possible

1600-1700

Retime S38 bpms

Decker/Bui

Stored beam & inj.

1700-1900

Single bunch gas bremsstrahlung intensity measurements (hybrid lattice)

Yang/ Dooling

Stored beam & inj.

1900-2400

324 set-up and orbit switch

Xiao

Stored beam & inj


Wednesday, December 08, 2010



0000-0100

324 set-up and orbit switch (continued)

Xiao

Stored beam & inj.

0100-0630

APS-U lattice

Emery/Xiao

Stored beam & inj.

0630-0800

Prepare for User beam (324 singlets)

OPS

Stored Beam & Injection