Machine Studies
Schedule for Run02-6, 2010
July 5th 0800 – July 6th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
07/05/10 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-1000 |
Investigate beam losses during IOCRF3HVPS reboots. |
DiMonte OPS |
Stored Beam & Injection |
1000-1400 |
Investigate hybrid single bunch limit. |
Sajaev Emery |
Stored Beam & Injection |
1400-1800 |
Procedure test of ID gap feedforward. |
Emery |
Stored Beam & Injection |
1200-1600 |
Test BacNet software |
Quock |
No Impact to operations |
1800-2200 |
Investigate vertical noise in P0 feedback. |
Yao |
Stored Beam & Injection |
2200-2400 |
Investigate 324-bunch instability with low RF voltage. |
Harkay |
Stored Beam & Injection |
|
07/06/10 |
|
|
0000-0200 |
Investigate 324-bunch instability with low RF voltage (continued). |
Harkay |
Stored Beam & Injection |
0200-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |