Machine Studies

Schedule for Run02-6, 2010

July 5th 0800 – July 6th 0800



Time

Descriptions

Studiers

SR Status

 

07/05/10

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-1000

Investigate beam losses during IOCRF3HVPS reboots.

DiMonte OPS

Stored Beam & Injection

1000-1400

Investigate hybrid single bunch limit.

Sajaev Emery

Stored Beam & Injection

1400-1800

Procedure test of ID gap feedforward.

Emery

Stored Beam & Injection

1200-1600

Test BacNet software

Quock

No Impact to operations

1800-2200

Investigate vertical noise in P0 feedback.

Yao

Stored Beam & Injection

2200-2400

Investigate 324-bunch instability with low RF voltage.

Harkay

Stored Beam & Injection

 

07/06/10

 

 

0000-0200

Investigate 324-bunch instability with low RF voltage (continued).

Harkay

Stored Beam & Injection

0200-0700

OPEN

 

 

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection