Machine Studies
Schedule for Run02-4, 2010
June 22nd 0800 - June 23rd 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, June 22, 2010 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0810-0900 |
Investigate noisy fan in RF1 matching transformer cabinet (requires 13.2kV lock-out) |
RF Group |
No impact |
0900-1000 |
Wiring verification at 35BM |
Friedman |
35BM off line |
0900-1100 |
Change SR absorber interlock chassis failing analog input cards in S14 and S33 |
Putnam |
No beam |
0900-1000 |
Replace dvx2502 module in iocbramp |
Xu |
No Injection |
0900-1100 |
Take bdot waveform data on booster mains |
Feng, Yao |
Coordinate w/ iocbramp work |
0900-1100 |
Replace S36 RF PLC touchscreen |
Meyer |
No Beam |
0930-1130 |
Troubleshoot 25BP1 and 27AP0 |
Erwin |
Access Zone D |
1130-1200 |
Recover SR |
OPS |
Stored beam & injection |
1200-1600 |
Coupling correction using response matrix |
Sajaev |
Stored beam & injection |
1600-1900 |
Optimize injection efficiency for hybrid lattice |
Xaio |
Stored beam & inj. |
1900-2300 |
P0 feedback studies |
Yao |
Stored beam & inj. |
2300-2400 |
OPEN |
|
|
|
Wednesday, June 23, 2010 |
|
|
0000-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |