Machine Studies

Schedule for Run02-4, 2010

June 22nd 0800 - June 23rd 0800



Time

Descriptions

Studiers

SR Status


Tuesday, June 22, 2010



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0810-0900

Investigate noisy fan in RF1 matching transformer cabinet (requires 13.2kV lock-out)

RF Group

No impact

0900-1000

Wiring verification at 35BM

Friedman

35BM off line

0900-1100

Change SR absorber interlock chassis failing analog input cards in S14 and S33

Putnam

No beam

0900-1000

Replace dvx2502 module in iocbramp

Xu

No Injection

0900-1100

Take bdot waveform data on booster mains

Feng, Yao

Coordinate w/ iocbramp work

0900-1100

Replace S36 RF PLC touchscreen

Meyer

No Beam

0930-1130

Troubleshoot 25BP1 and 27AP0

Erwin

Access Zone D

1130-1200

Recover SR

OPS

Stored beam & injection

1200-1600

Coupling correction using response matrix

Sajaev

Stored beam & injection

1600-1900

Optimize injection efficiency for hybrid lattice

Xaio

Stored beam & inj.

1900-2300

P0 feedback studies

Yao

Stored beam & inj.

2300-2400

OPEN




Wednesday, June 23, 2010



0000-0700

OPEN



0700-0800

Prepare for User beam

OPS

Stored Beam & Injection