Machine Studies
Schedule for Run02-2, 2010
June 8th 0800 - June 9th 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Tuesday, June 08, 2010 |
|
|
0800-0810 |
Collect XBPM orbit data |
OPS |
Stored Beam & Injection |
0810-0900 |
Gap Scans and update IDGapFF look-up tables |
Schroeder |
Stored Beam & Injection |
0900-1100 |
Check S:IK4 kicker power supply for slow ramping up voltage waveform |
Wang |
No beam |
0900-1100 |
Troubleshoot S26A:Q5 |
Puttkammer |
No Beam |
0900-1100 |
Troubleshoot IR thermometer on S36, cavity 2, DS, replace meter in rack if necessary |
Morrison |
No beam |
0900-1000 |
RF waveguide switch to RF2 |
Horan |
No Beam |
0900-1100 |
Swap LTP:V1 Dac |
Hillman |
No Injection |
0930-1000 |
Remove BLM in BTX line |
Erwin |
Access Booster |
0930-1000 |
Measure for filed monitoring probe installation |
Feng/Donley |
Access Booster |
1000-1030 |
Remove BLM fiber optic cables |
Brill |
Access Zone E |
1030-1100 |
Recover Booster and SR systems |
Ops |
Stored Beam & Injection |
1100-1300 |
Verify RF2 operation at lower voltage |
Horan |
Stored Beam & Injection |
1100-1300 |
Linac/PAR noise studies. Parallel to RF2 tests. |
Pasky |
Injection |
1300-1400 |
Test RF IOC reboot. |
Schroeder DiMonte |
Stored Beam & Injection |
1400-1700 |
Troubleshoot bunch purity monitor. |
Pietryla |
Stored Beam & Injection |
1700-1800 |
Test setpoint change rate for LTP correctors. |
Fors |
No injection |
1800-1900 |
Check PAR setup. |
Yao |
Stored Beam & Injection |
1900-2300 |
Test feedback system. |
Yao |
Stored Beam & Injection |
2300-2400 |
Install new BPM gains. |
Sajaev Xiao |
Stored Beam & Injection |
|
Wednesday, June 09, 2010 |
|
|
0000-0100 |
Install new BPM gains (continued). |
Sajaev Xiao |
Stored Beam & Injection |
0100-0500 |
Continue APS-U lattice test. |
Sajaev Xiao |
Stored Beam & Injection |
0500-0700 |
OPEN |
|
|
0700-0800 |
Prepare for User beam |
OPS |
Stored Beam & Injection |