Machine Studies

Draft Schedule for Run02-1, 2010

May 26th 0800 – June 2nd 0800

Time

Descriptions

Studiers

SR Status


(Pre-Studies)

Monday, May 24, 2010



1300-1500

Initial set-up of S35BM Pinhole image

Yang

Stored beam

1500-1700

PEM/Script testing

Schroeder/OPS

Stored beam & injection






(Pre-Studies)

Tuesday, May 25, 2010



0800-1100

BPLD Validations

Bui

Stored beam & injection

1100-1500

MPS and ACIS shutdown validations of RF1 and RF2

M.Smith/OPS/ RF Group

No beam

1100-1500

Linac/PAR beam studies

Pasky

No injection

1100-1500

Investigate Canted Undulator P.S.

Puttkammer

No beam

1100-1500

Additional P.S. check-out

Fors

No beam










Wednesday, May 26, 2010



0700-1000

XBPM checkout

Hahne

Stored beam & occasional inj.

1000-1800

Initial bpm checkout

Decker/Bui

Stored beam & occ. inj.

1800-2400

CPU checkout

Xiao

Stored beam & occ. inj.


Thursday, May 27, 2010



0000-0800

OPEN



0800-1600

Orbit recovery (324 singlets, then 24 singlets top-up)

Decker/Xiao

Stored beam & inj.

1600-2400

Cherenkov detector studies

Yang

Stored beam & occ. inj.


Friday, May 28, 2010



0000-0700

OPEN



0700-1200

Finish unresolved PS testing

Fors/Sprau

No Beam

0800-1200

PSS shutter tests

SI Group

No Beam

0800-1200

Waveguide switch and conditioning RF without beam (conditioning after access)

RF Group

No beam

0830-0930

Check stripline temperature tape

Yao, Morrison

Access Zone F

1200-1600

Condition RF2 with beam

RF Group/OPS

Stored beam & inj.

1600-2400

Final BPM check-out (OPS orbit)

Decker/Lill

Stored beam & inj.


Saturday, May 29, 2010



0000-1000

OPEN



1000-1400

Set-up Sector 35 for User Run (Set-up bunch purity monitor, pinhole camera & others) top-up

Yang

Stored beam & occ. inj.

1400-2400

OPEN




Sunday, May 30, 2010



0000-1000

OPEN



1000-1400

Test deflecting strength of new S35 stripline (24 singlets)

Yao

Stored beam & occ. inj.

1400-1800

OPEN



1800-2400

CPU fine Tuning (AC mode)

Xiao

Stored beam & occ. inj.


Monday, May 31, 2010



0000-0800

Top-up operational check

OPS

Stored beam & inj.

0800-1200

OPEN



1200-1800

HOM spectra measurements for standard bunch patterns

Harkay

Stored beam & inj.

1800-2400

OPEN




Tuesday, June 01, 2010



0000-0600

OPEN



0700-0800

Retrieve lift bar from S26A:Q5

P.S. Group

No beam

0700-0800

Reboot IOCID04b

M. Smith

No impact

0700-0900

Check out RF2 with no beam and waveguide switch to RF2/4 providing

RF Group

Stored beam

0900-1200

Condition RF2 klystron with beam

OPS/RF Group

Stored beam & inj.

1200-1600

XBPM studies

Yang

Stored beam & inj.

1600-2000

BPM Gain measurements

Sajaev

Stored beam & inj.

2000-2400

APS lattice upgrade studies

Sajaev

Stored beam & inj.


Wednesday, June 02, 2010



0000-0200

APS lattice upgrade studies (continued)

Sajaev

Stored beam & inj.

0200-0800

OPEN



0600-0800

Prepare for user Operations (24 singlets – Top-Up)

Ops

Stored Beam & Injection