Machine Studies

Schedule for Run01-5, 2010

March 1st 0800 – March 3rd 0800



Time

Descriptions

Studiers

SR Status


Monday, March 01, 2010



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder

Stored Beam & Injection

0900-0930

Waveguide switch to RF3/RF4

Horan

No Beam

0900-1000

investigate quad control issues (requires all quadupoles on)

Sajaev/Fors/ Xu

No beam

0900-1100

Install waveguide blanking plate at waveguide flange TL27

Horan

No Beam

0900-1100

Test noise issues with BEK

Puttkammer

No Injection

0900-1100

Troubleshoot Booster Dipole notch filter

Feng

No Injection

0900-1100

Troubleshoot S:BM 6Gev I dropouts

Puttkammer

No Beam

1000-1100

Investigate SR Raw 4:5 T2 blown crowbar fuse

Puttkammer

No beam

1000-1100

Test PAR chromaticity measurement script (SR Freq. will be changed)

Yao/Shang

No SR beam

1100-1200

Storage-ring Training

Pasky/ Schroeder

Stored beam & inj.

1200-1400

Setup hybrid lattice

Xiao

Stored beam & injection

1400-1800

Switch from 24 singlets to hybrid

Xiao

Stored beam & inj.

1800-2200

P0 feedback with 12x8mA

Yao

Stored beam & inj.

2200-2400

Continue small dynamic aperture study

Sajaev/Emery (remotely)

Stored beam & inj.


Tuesday, March 02, 2010



0000-0200

Continue small dynamic aperture study

Sajaev/Emery (remotely)

Stored beam & inj.

0200-0600

Continue testing 8LSS.

Sajaev

Stored beam & inj.

0600-1100

S4 Cherenkov detector studies

Yang

Stored beam & inj.

1100-1500

Continue fine tune of CPU AC mode

Xiao

Stored beam

1100-1500

High charge injector study (beam through the Booster)

Yao, Yang

Limited injection

1500-2300

1+3x7 fill for 32-ID -- Top-up (requires shutters open) (1 hour closed shutters sometime in the middle while fuel injectors are switched)

32-ID

Stored beam & injection

2300-2400

Test various new sextupole settings

Sajaev

Stored beam & inj.


Wednesday, March 03, 2010



2400-0300

Test various new sextupole settings

Sajaev

Stored beam & inj.

0300-0630

Test single sextupole correction

Sajaev

Stored beam & inj.

0630-0800

Prepare for User beam

OPS

Stored Beam & Injection