Machine Studies

Schedule for Run01-10, 2010

April 6th 0800 – April 7th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, April 06, 2010



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0909

Gap Scans and update IDGapFF look-up tables, restore gaps to User Operations

Schroeder

Stored Beam & injection

0909-0910

Take tune measurement

OPS

Stored beam

0910-1000

Connect scope to measure noise which may be causing Kly Out Arc trips

RF Group

No beam

0910-1000

relocate prototype Beam Loss Monitor at 33ID chamber

Erwin/Brill

Zone E Access

0910-1100

Investigate IOCRFsource reboot problem without beam

DiMonte/RF Group/OPS

No beam

0910-1030

NRTL inspections on SR Dipole

Puttkammer

No beam

0910-1100

Replacement of the Spectrum Analyzer in Rack 5 of RF2

Epperson

No beam

0910-1030

swap out and test L3:AM1, PTB:Q1, PTB:Q6 and PTB:Q10

Puttkammer

No beam

1030-1100

Recover injectors, standardize entire ring, fill & take tune measurement

OPS

Stored beam & injection

1100-1200

Investigate IOCRFsource reboot problem with beam

DiMonte/RF Group/OPS

Stored beam & injection

1200-1400

Linac/Par beam studies to verify Sys.Ref files

Pasky

Stored beam & limited injection

1400-1700

Study the suspected HOM-driven longitudinal instability (324s, 100 mA, intermittent injection)

Harkay

Stored beam & injection

1500-1700

Investigate Booster Injection

Yao

Injection available

1700-1900

optimize bunch purity with 350 MeV injector beam. Requires 24 singlets fill in the SR and bunch purity measurement.

Yao/T. Smith

Stored beam & injection

1900-2300

P0 feedback with 8mA per bunch

Yao

Stored beam & injection

2300-2400

Set up new RHB lattice S23

Xiao, Sajaev

Stored beam & injection


Wednesday, April 07, 2010



0000-0700

Set up new RHB lattice S23

Xiao, Sajaev

Stored Beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection