Machine Studies

Schedule for Run03-5, 2008

October 28th 0800 - October 29th 0800


Time

Descriptions

Studiers

SR Status


Tuesday, 10/28/08



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0900-1000

Restore cmpsi fiber to S24A:H3

Fors

No Beam

0900-1000

Troubleshoot Booster BPMs

Lenkszus

Limited Injection

0900-1000

Replace light bulb in RF5 SCR

RF Group

No injection

1000-1030

Reboot iocs37fb

Lenkszus

Stored Beam & Injection

0900-1000

Replace SCR cabinet beacon at RF-3

Horan

No Beam

0900-1000

Troubleshoot B:IK

Puttkammer

No Injection

0900-1100

L2 klystron emission studies

Cours

No Injection

0900-1200

RG1 Modes reference files(limited injection last 1 hour)

Pasky

No Injection or Limited Inj.

1100-1400

Thermal analysis study (shutter permit needed)

Capatina, 12-ID

Stored Beam

1200-1400

Booster training

Karl

Limited injection

1400-1800

P0 feedback studies

Yao, Sajaev

Stored beam & Inj.

1800-2200

Recover orbit for 324 singlets

Decker, Sajaev

Stored beam & inj.

2200-2400

Set-up low emittance lattice in the Booster and characterize injection losses

Sereno, Emery

Stored beam & inj.


Wednesday, 10/29/08



0000-0200

Set-up low emittance lattice in the Booster and characterize injection losses

Sereno, Emery

Stored beam & inj.

0200-0400

Verification of CPU correction

Emery

Stored beam

0400-0600

Booster training

Fystro

Limited injection

0630-0800

Prepare for User beam (324 singlets)

OPS

Stored Beam & Injection