Schedule for Run03-2, 2008

October 7th 0800 - October 8th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 10/7/08



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0900-1700

Terminate Video MUX cabling

Grelick

No Impact

0900-0930

Reboot interleaving DSPs

Fors

No Injection

0930-1030

Open bus ties on X7, X8 and X9 switchgear.

Kailus


0930-1000

Check PAR dipole supply

Puttkammer

No injection

0930-1030

Troubleshoot S37cav 2 downstream IR thermometer

Horan

Access Zone F


0930-1030

Implement changes to S:IS1 PVs

Xu

No Beam

0930-1030

Replace CPU at IOCRFTIME1

Di Monte

No Injection

0930-1130

Booster ripple studies

Feng, Yao

No Injection

1030-1200

Update SCRs for Linac mode changes

Pasky

Limited injection

1030-1100

Recover SR systems

Ops


1130-1200

Recover Booster systems (store 24 singlets -- 102 mA before training begins)

Ops

Stored Beam & Injection

1200-1400

Booster Training

Fystro

Limited injection

1230-1400

Generate horizontal bumps through RF sector arc to determine reaction at IR detectors and other rf readbacks

Harkay, (Emery or other)

Limited injection

1400-1700

X-ray BPM studies

Decker/Hahne

Stored beam & Top-up

1700-2100

Continue corrector punching down experiment and P0 feedback study

Yao

Stored beam & Injection

2100-2400

CPU AC Mode Correct

Emery, Xiao

Limited Injection

2100-2300

Booster Training

Karl

Limited Injection






Wednesday, 10/8/08



0000-0300

Determine cause of injection limits at 100mA for 24 singlets

Emery, Sajaev

Stored beam & injection

0300-0700

Tune SR injectors for 300MeV & run top-up for 1 hours

Sereno, Emery

Stored beam & injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection