Machine Studies

Schedule for Run03-2, 2007

October 9th 0800 - October 10th 0800



Time

Descriptions

Studiers

SR Status

 

Tuesday, 10/9/07

 

 

0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Gap Scans and update IDGapFF look-up tables

Schroeder/OPS

Stored Beam & Injection

0900-1000

Replace VME card in iocid04b

Smith

No Beam

0900-1000

Replace MPC-3 ion pump controller for VM-35-2IP5

Hoyt

No beam

0930-1030

Troubleshoot S37 cav 1 tuner and S37cav 2 upstream IR thermometer

Horan

Access Zone F

0900-1030

Measure optical power from CMPSI fibers to S32A:V3.

Fors

No Beam

0900-1030

Check Cerenkov detectors in sectors 9 and 10.

Brill Yao Dooling

Access Zone B

1030-1100

Recover SR systems

Ops

Stored Beam & Injection

1100-1500

Linac PEM tool validation.

Pasky

No injection

1500-1700

Beam loss measurements.

Yao Dooling

Stored Beam & Injection

1700-2000

P0 feedback test.

Yao

Stored Beam & Injection

2000-2200

Booster tune system test.

Yao

Stored Beam & Injection

2200-2400

Measure beam size as a function of current.

Harkay

Stored Beam & Injection

 

Wednesday, 10/10/07

 

 

0000-0400

Deflecting cavity lattice test.

Emery Sajaev

Stored Beam & Injection

0400-0700

CPU check.

Emery

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection