Draft Schedule for Run01-9, 2007

March 27th 0800 - March 28th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 3/27/07



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

SR PEM testing

Soliday

No Beam

0810-0830

Switch from pump 402 to 401

Ferry

No Beam

0810-0900

7ID PSS end to end test

Forrestal

No Beam

0810-0900

Testing of AFG100 Driver Patch for Booster Dipole

Fors, Lenkszus

No Injection

0810-0900

Reboot CPU IOC

Smith

No Beam

0830-0930

Map removal of 11ID EMW

Grimmer

Access Zone B

0810-1200

IK1 power supply work.

PS group

No beam

1200-1230

Recover Storage Ring

OPS

Stored Beam & Injection

1230-1430

Gap scan PEM testing. Last 30 minutes parallel to PC gun study – no injection.

Decker Shang

Stored Beam & Injection

1400-1800

PC gun study.

Sereno

No injection

1430-1800

BPM tests. Parallel to PC gun study.

Singh

Stored beam

1800-1900

Investigation of elevated S34 ion pump reading.

Schroeder

Stored Beam & Injection

1900-2300

ID xbpm alignment.

Decker Hahne

Stored Beam & Injection

2300-2400

Setup hybrid lattice.

Emery Sajaev

Stored Beam & Injection


Wednesday, 3/28/07



0000-0500

Setup hybrid lattice (continued).

Emery Sajaev

Stored Beam & Injection

0500-0700

Measure tune slope in All ID RHB lattice.

Sajaev

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection