Machine Studies

Draft Schedule for Run01-7, 2007

March 20th 0800 - March 21st 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 3/20/07



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Repair RF rad monitor

RF group

No Beam

0810-1000

Swap out S29BQ2, S29AQ4 and S34AQ2

Puttkammer

No Beam

0810-1000

Test AFG100 Driver patch

Fors

No Injection

1000-1300

3 hrs SR console test

Poncin

Stored beam & Injection. No parallel studies

1300

Inject 100 mA.

OPS


1300-1600

Test CTR diagnostics in the linac.

Sereno

No Injection

1300-1500

S1/S3 bpm tests. Parallel to CTR diagnostics study.

Singh Sun

Stored beam

1600

Inject 100 mA.

OPS


1600-1900

Linac study.

Pasky Shang

No Injection

1500-1900

ID gap feedforward. Parallel to CTR and linac study.

Emery

Stored beam

1600-1700

Regression test of booster main ramped supply. Parallel to linac and SR studies.

Sereno

No beam required

1900-2100

Fix orbit in S35 for pinhole alignment.

Emery Sajaev

Stored Beam & Injection

2100-2200

Align BM pinhole camera.

Yang

Stored Beam & Injection

2200-2400

P0 feedback drive test.

Yao

Stored Beam & Injection


Wednesday, 3/21/07



0000-0300

Setup hybrid for symmetric lattice.

Sajaev

Stored Beam & Injection

0300-0700

Measure tune slope in All ID RHB lattice.

Sajaev

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection