Machine Studies

Draft Schedule for Run01-4, 2007

February 19th 0800 - February 21st 0800



Time

Descriptions

Studiers

SR Status


Monday, 2/19/07



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Switch from RF2/RF4 to RF3/RF4

Cours

No Beam

0810-1000

Repair faulty analog read backs

Puttkammer

No Beam

0810-1200

Match electrical length of amplifiers

Yao

No Impact to studies

0830-0930

Replace failed strobe

Forrestal

Access Linac/PAR

0830-0930

Map waveguide run

Grelick

Access Linac/PAR

0830-0930

Measure limit switches for covers

Theres

Access Linac/PAR

1000-1100

Test PAR septum changes

Hillman, Varotto

Limited Injection

0930-1000

Recover Linac/PAR

OPS

Limited injection

1000-1200

ID32 shielding verification.

Salazar

Stored Beam & Injection

1000-1015

Test power cycling of the linux server.

Varotto

Bunch current monitor unavalable

1200

Inject 102 mA.

OPS


1200-1600

Linac study with PC gun.

Pasky

No injection

1200-1400

Test switch between SR orbit controllaw. Parallel to linac study.

Shang

Stored beam

1200-1300

SR pulsed supplies PEM testing. Parallel to linac study.

Soliday

Stored beam

1300-1500

Investigate P3BMT1 & L5:QM4. Parallel to linac study.

Hillman

No injection

1600-1700

Setup and vrify bunch cleaning system.

Gold Yao

Stored Beam & Injection

1700-2000

Test P0 feedback drive.

Gold Yao

Stored Beam & Injection

2000-2400

CPU correction.

Emery

Stored Beam & Injection


Tuesday, 2/20/07



0000-0400

Characterize AC noise at P0/P1 bpms.

Singh Sun

Stored Beam & Injection

0400-0700

Switch to K1 and K2 down modes.

Sereno

No injection

0700-1300

Xbpm alignment.

Decker Hahne

Stored Beam & Injection

0900-1100

Work on BTS bpms. Parallel to xbpm alignment.

Erwin

No effect on anything

1100-1300

Work on PTB:V3 bpm. Parallel to xbpm alignment.

Erwin

No effect on anything

1300-1500

Troubleshoot S32A:P3 bpm.

Erwin

Stored Beam & Injection

1500-1900

FF feedforward.

Emery

Stored Beam & Injection

1500-1700

Test PAR bpms. Parallel to FF feedforward.

Erwin

Injection possible

1900-2300

Continue setting up reference lattice.

Emery Sajaev

Stored Beam & Injection

2300-2400

Continue “All ID RHB” lattice.

Sajaev

Stored Beam & Injection


Wednesday, 2/21/07



0000-0300

Continue “All ID RHB” lattice (continued).

Sajaev

Stored Beam & Injection

0300-0700

Setup S8 RHB hybrid lattice.

Sajaev

Stored Beam & Injection

0700-0800

Prepare for User beam

OPS

Stored Beam & Injection