Draft Schedule for Run01-3, 2007

February 13th 0800 - February 14th 0800



Time

Descriptions

Studiers

SR Status


Tuesday, 2/13/07



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0830

Switch water pump for S33/34

Ferry

No Beam

0810-0900

Install P0 feedback system amplifiers

Yao

No Impact to studies

0810-0900

PEM testing

Schroeder

No beam

0810-1000

Troubleshoot RF3 auxiliary ion pump controller circuit.

RF group

No beam

0810-0900

Replace VME board in iocid12.

Smith

No beam

1000-1030

Recover SR beam.

OPS

Stored beam & injection

1030-1100

ID32 shielding verification with 50 mA.

Ramanathan

Stored beam & injection

1030-1100

Test power cycling of linux server for bunch current monitor. Parallel to shielding verification.

Varotto

Stored beam & injection

1100-1300

Linac beam study.

Pasky

Injection on request

1100-1300

Measure SR DCCT frequency spectrum with different fill patterns. Parallel to linac beam study.

Pietryla

Stored beam & injection

1300-1600

Create reference lattice with beam centered everywhere.

Sajaev Emery

Stored beam & injection

1600-1800

Bpm tests.

Singh

Stored beam & injection

1600-1800

PAR bpm tests. Parallel to orbit recovery.

Yao

Injection on request

1800-2000

Test P0 feedback drive.

Yao

Stored beam & injection

2000-2200

9-m pin-hole steering optimization.

Emery Yang

Stored beam & injection

2200-2400

Xbpm gap scans.

Decker

Stored beam & injection


Wednesday, 2/14/07



0000-0400

Xbpm gap scans (continued).

Decker

Stored beam & injection

0400-0700

OPEN



0700-0800

Prepare for User beam

OPS

Stored Beam & Injection