Machine Studies

Schedule for Run01-12, 2007

April 17th 0800 - April 17th 2400



Time

Descriptions

Studiers

SR Status


Tuesday, 4/17/07



0800-0810

Collect XBPM orbit data

OPS

Stored Beam & Injection

0810-0900

Investigate PAR dipole current fluctuations.

PS group Yao

No injection

0810-0900

Standardize to last 24 bunches file and inject 100 mA at 0900.

OPS


0900-1300

PC gun studies.

Sereno

No Injection

0900-1100

P0 feedback data acquisition test. Parallel to PC gun studies.

Yao

Stored beam

1100-1300

Test ID gap FF with new runcontrol PVs. Parallel to PC gun studies.

Emery

Stored beam

1300-1500

Study microwave instability.

Chae Yao

Stored beam & injection

1500-1700

Accumulation limit study.

Emery Chae

Stored beam & injection

1700-2100

S37 vacuum and instability study and other instability stuff.

Harkay

Stored beam & injection

2100-2400

ILC damper bunch distribution in APS.

Harkay

Stored beam & injection