Machine Studies

Schedule for Run2-2,2004

May 31 0800 to June 1 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 05/31/04

 

 

0800-0815

Record orbit data.

OPS

Stored beam

0815-1015

Dipole work.

PS group

No SR beam

0815-0900

Check the wiring and current loop for S36 hybrid 3 return flow. Parallel to dipole work.

RF group

No SR beam

0815-1000

Waveguide switch from RF1 to RF4 (if necessary).

RF group

No SR beam

1015-1300

BPM database update for 24 bunches.

Singh

Stored beam and injection

1300-1500

Collect xbpm feedforward data.

Singh Decker

Stored beam and injection

1500-2100

Canted undulator feedforward measurements.

Decker

Stored beam and injection

2100-2400

Investigate lifetime decrease.

Emery Sajaev

Stored beam and injection

 

Tuesday, 06/1/04

 

 

0000-0300

Check proper functioning of bpm histories from BPM dumps.

Emery

Stored beam and injection

0300-0600

Investigate ID steering step non-closure.

Emery

Stored beam and injection

0600-0700

Verify ID switching PEM.

Yao

Stored beam and injection

0700-0800

Prepare for user beam. 24 singlets, topup.

OPS Yao

Stored beam and injection