Machine Studies

Schedule for Run2-6,2003

July 4th, 0800 - July 5th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Friday, 07/04/03

 

 

0800-0900

Zone F access to check sector 40 ik4 downstream bellows top air cooling

blower hose during next machine intervention.

Putnam

No beam

0800-1000

Control access to Zone-D to lock 23ID shutter, LOTO switch gear required

Merritt

No beam

0800-0900

Replace erratic SR absorber Love controller in sector 40 circuit 1.

Putnam

No beam

1000-1800

X-BPM feedback/feedforward

Decker

Stored beam and injection

1800-2400

Single bunch studies vs rf freq.

Injection is required.

Harkay

Stored beam and injection

 

Saturday, 07/05/03

 

 

0000-0200

Operator storage ring training

Christensen

 

0200-0500

RTFB instability study

Emery

Stored beam and injection

0500-0700

Studies time available

 

Stored beam and injection

0700-0800

Singlet fill pattern, low emittance, top-up user beam

OPS

Yao

Stored beam and injection