Machine Studies

Schedule for Run1-11,2003

April 7th, 0800 - April 9th, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 04/07/03

 

 

0800-1600

L6 piping modification. Parasitic to all work, chance to trip off a klystron.

Dortwegt

 

0800-1000

Setup hybrid mode orbit.

Singh

Stored beam and injection

1000-1500

Local impedance. After 1 hours it is parasitic to PEM testing.

Sajaev

Stored beam, no injection

1100-1500

PEM testing.

Pasky

No injection

1300-1500

LTP Besocm studies. Parasitic to PEM testing.

Peitryla

No injection

 

 

1500-1700

 

ID3 dosimeter change.

Petra

ACCESS Zone A

Measurements of RF gun kicker dimensions.

Wang

ACCESS Linac

Check locations of water fittings on ID23.

Grimmer

ACCESS Zone D

1500-1700

userRun PV test. Parasitic to access.

Maclean

No beam

1500-1700

Switch RF5 back. Parasitic to access.

RF group

No beam

1700-2400

324 bunches mode practice.

Decker Emery Sereno

Stored beam and injection

1.5 hours

during 1700-2200

OPS training. Parasitic.

OPS

Limited injection

 

Tuesday, 04/08/03

 

 

0000-0100

324 bunches mode practice. Continued.

Decker

Stored beam and injection

0100-0500

S1 PSCU problem investigation.

Fors

Stored beam and injection

0100-0500

BTS optics study. Parasitic to PSCU work.

Emery

Injection

0500-1300

Direct PC gun to booster injection.

Sereno

No injection

0500-0900

Test of expanded set of BPMs for RT feedback. Parasitic to direct booster injection.

Emery Lenkszus Shang

Stored beam, no injection

0730-1600

L6 piping work. Parasitic to all work, chance to trip off a klystron.

Dortwegt

 

0900-1300

CPU triggering hardware fix. Parasitic to direct booster injection.

Deriy

No SR beam

0900-1300

RF4 power monitor work.

RF group

No beam

 

1100-1300

S15B:MT readback investigation. Parasitic to direct booster injection.

Puttkammer

No beam

Inspect SR raw supplies T3 & T4. Parasitic to direct booster injection.

Sprau

No beam

Test the spare SR dipole ps regulator card. Parasitic to direct booster injection.

Fors

No beam

1300-1700

ID16 shielding verification.

Ramanathan

Stored beam and injection

1500-1630

OPS training. Parasitic to shielding verification.

OPS

Limited injection

1700-1900

CPU perturbation correction.

Emery Vasserman

Stored beam and injection

1900-2100

ID18 feedforward.

Singh Decker

Stored beam and injection

2100-2300

ID11 rfbpm, S1A:P0, S35ID xbpms tests.

Singh Sun Erwin Hahne

Stored beam and injection

2300-2400

Bursting mode investigation and energy spread measurements.

Chae Yang Harkay

Stored beam and injection

 

Wednesday, 04/09/03

 

 

0000-0500

Bursting mode investigation and energy spread measurements. Continued.

Chae Yang Harkay

Stored beam and injection

0500-0700

Beam excitation study.

Yao

Stored beam and injection

0530-0630

Booster requalification test.

OPS

No injection

0700-0800

Prepare for user operation. Low emittance, hybrid mode.

Yao

Stored beam and injection