Machine Studies

Schedule for Run2-4,2002

June 18th, 0800 - 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 06/18/00

 

 

0800-1400

RF5 fuse disconnect.

Trento
Bromberek

Stored beam for some time

0800-0900

PAR operator re-qualification

OPS

Stored beam and no injection

0900-1000

Test ID mode switching software

Borland

Stored beam and no injection

0800-0900

Measure neutron signal during RF gap voltage ramp

Emery
Job

Stored beam

0900-1000

Test sddscontrollaw change

Emery

Stored beam and no injection

0900-1000

Switch to RG1

Borland

Stored beam and no injection

1000-1100

iocsrmon upgrade

Dimonte

No beam

1000-1200

IS1 DAC ramp rate.

J. Wang

No beam

1000-1200

Gespac problem investigation in sector 9. (need to operate Zone A)

ESG

No beam

1000-1200

Motor problem in ID9. (Zone B access)

Grimmer

No beam

1000-1200

15BM EPS work

ESG

No beam

1000-1200

ACIS BTS double beam stop controller

Hogrefe

No beam

1000-1100

VME bus analyzer on iocs23fb.

Lenkszus

No beam

1100-1200

Test corrector restore.

Lenkszus

No beam

1400

Inject into Storage ring. Check injection software.

OPS

Stored beam and injection

1400-1500

Check 130 mA injection for storage ring. (Preparation for June 24th run.)

Yao
Singh
Harkay

Stored beam and injection

1500-1600

Fine adjustments of EMW correction.

Emery

Stored beam and injection

1500-1600

Recover for User beam and top-up

OPS

Stored beam and injection