Machine Studies

Schedule for Run2-13,2002

August 19th, 0800 - August 21th 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 08/19/02

 

 

0800-0830

Orbit data collection.

Singh

Stored beam and no injection

0830-1230

Change out circuit breaker TDP-R4-9 in building 420. (No power to SR PS during some time).
Install FORS-2 chip in a double sector
Inspect S18/29 T4 raw ps and likely replace the external interlock relay.
Replace S8BQ2 S13BV3 converters.

Markovich
Fors
McNamara
Puttkammer

No beam

0830-1030

Zones E access for replacing S31A:P1 filter comparator with a SMA-TNC patch panel

Erwin

No beam

0830-1030

Zones F access to exchange and source check the IP-100 (Gamma Probe) at RM-10

Vacca

No beam

0830-1030

Zones A access for checking 1ID P1 translation stage problem.

Erwin

No beam

0830-1030

Zones A access for checking 2ID bpm problem.

Kruy
Shu

No beam

0830-1030

Zones A access for replacing alinine films on ID3

Petra

No beam

0800-1030

Check network connection between PAR RF iocs. Change trigger source to PAR RF function generator. Need linac beam.

Dimonte
Sidorowizc
Johnson

No beam

1030-1230

Calibrate a power divider for the injector test stand. May need to reboot ioclirfgun

Maclean.

No beam

1230-1300

FORS-2 chip testing with beam

Fors
Maclean

Stored beam and injection

1300-1400

SR training

Hill

Stored beam and injection

1400-1500

Test NbBpm/DBPLD with the P1 buttons at ID21

Pietryla

Stored beam and injection

1500-1800

Setup new hybrid bunch pattern for low emittance lattice.

Singh

Stored beam and injection

1800-2000

Investigate beam loss during topup that seemed to be related to an instability

Harkay

Stored beam and injection

2000-2400

Investigate multibunch instabilities for future operational fill patterns

Harkay

Stored beam and injection

 

Tuesday, 08/20/02

 

 

0000-0500

Measure the response matrix and bpm history at 1mA and 3mA. Need IK5 in CW mode.

Sajaev

Stored beam and injection

0500-0900

Switch SR bpm to datapool polynomials and new gains. Check steering.

Emery
Shang
Singh

Stored beam and injection

0900-1200

Xray bpm tests.

Singh
Deming
Erwin
Hahne

Stored beam and injection

0900-1200

ID xbpm gain vs gap measurements

Hahne
Roberts

Stored beam and injection

0900-1200

Take bunch length data on linac mm-wave horn. Parallel to above SR study.

Decker
Borland

Stored beam and injection

1200-1300

SR training

Hill

Stored beam and injection

1300-1600

CPU tuning

Vasserman
Makarov
Emery

Stored beam and injection

1600-1900

Data pool correction. Adjust RTFB regulrator for optimum interaction with datapool correction.

Shang
Emery

Stored beam and injection

1900-2400

Lower emittance lattice optics steering and injection optimization

Emery
Sajaev

Stored beam and injection

 

Wednesday, 08/21/02

 

 

0000-0600

ID gap feedforward.

Decker
Singh

Stored beam and injection

0600-0700

Re-install the original corrector DAC chips in 2 sectors

Fors

No beam

0700-0800

Setup for User low-emittance topup.

OPS

Stored beam and injection