Machine Studies

Schedule for Run1-7,2002

03/04, 0800 to 03/6,0800

Time

Descriptions

Studiers

SRStatus

 

Monday, 03/04/02

 

 

0800-0815

Collect xbpm user orbit reference with beam, stored beam, no top-up

Singh

Stored beam and injection

0815-0915

Investigate and eliminate the periodic crashes of ioclic2

Arnold

No beam

0815-1200

Inspect SR IK1, IK3, IK4 for loose wire

McNamara

No beam

0815-1200

Continue the repair of SR corrector reservoir capacitor crimp in zone B (no access)

McNamara

No beam

0815-1200

Continue to verify corrector feed-forward signals in zone-C and D (no access)

McNamara

No beam

0815-1000

Installation of an upgraded motorized phase shifter

Grelick

No beam

0815-0930

Visually inspect the RF4 ACIS interface for evidence of a defective AC power relay

Horan

No beam

1000-1100

Setup RG1 to support machine studies

Pasky

No beam

0815-0930

Replace the circulator TCU bias potentiometers at RF3 and RF5.

 

Horan

No beam

0800-1200

PSS rewiring, requires 5BM offline

Ross

No beam

0815-0930

P0 signal investigation

Nassiri

No beam

0815-1200

Access booster to upgrade booster filter/comparator

Lill

Singh

No beam

0800-1200

Par scope problem investigation

Borland

Stein

No beam

1200-1600

Local bump impedance measurements with fast orbit correction

Emery

Stored beam, and injection

1600-2000

Test of ID gap FF coefficient measurement with fast orbit correction

Emery

Stored beam, and injection

2000-2100

Booster/SR training

Shultes

Stored beam, and injection

2100-2400

High Emittance lattice orbit recovery

Singh

Decker

Stored beam and injection

2100-2400

Test booster longitudinal controllaw using PAR rf phase knobs, SR injection may be needed.

Sereno

Stored beam and injection

 

Tuesday, 03/05/02

 

 

2400-0300

High Emittance lattice orbit recovery

Singh

Decker

Stored beam and injection

0300-0500

Booster operator training, switch back to RG2

Sutton

Stored beam and injection

0500-0600

Switch the linac back to RG2

OPS

Stored beam and injection

0600-1000

Top-up with RG2 to booster injection

Borland

stored beam, no injection

0900-1100

Operator SR qualification

Rivera

Yao

Stored beam and injection

1100-1500

Orbit control test with RAW CA and some changes

Emery

Shang

Stored beam and injection

1500-1900

CPU AC mode measurement tests.

Emery

Sereno

Vasserman

Stored beam, and injection

1900-2200

Long. injection lattice correction

Emery

Sajaev

Stored beam, and

injection

2200-0400

BPM cogging test

Decker

Singh

Stored beam, and

injection

 

Wednesday, 03/06/02

 

 

0400-0700

HOM studies with hybrids fill pattern

Song

Stored beam and injection

0700-0800

Ready user beam with high emittance lattice, singlet fill pattern

OPS

Yao

Stored beam and injection

 

End of Studies