Accelerator Physics Group Safety Page

    APS Safety page

    Safety training profile (safety class status, eJHQ) (login using Argonne Domain account)

    Web-based safety training classes

    Integrated Safety Management

    • APS ISM page
    • Argonne ISM page
    • EQO 205 - Graded Approach Overview
    • SUF ISM Day presentations (Jun 6, 2008)
    • AP group ISM Day presentation (Jun 6, 2008)


    APS Technical Procedures Table (see also individual procedures below)

    iCatch: Issues, Corrective Action Tracking and and Committment Handling System


    Safety in what we do:

    Access to SAD and procedures requires login to ICMS


    Office environment, computer usage

      Office safety, ESH Manual 7.10
      Use of power strips, ESH Manual 9.3 (see 9.3.4)
      Ergonomics, ESH Manual 7.5


    APS machine studies

      APS Safety Assessment Document (SAD), June 2006
        Safety/operating envelopes (Table 5.1)
      Guidelines for operating the Storage Ring at current > 100 mA
      Procedure for Operating the Storage Ring at Low Energy (< 6.3 GeV)
      ACIS Controlled Access Procedure (see Section 5 for safety training requirements for personnel entering tunnels)


    Laser Operation and R&D (bldg 411 except where noted)

      Photoinjector Drive Laser Standard Operating Procedure (SOP)
      Quarterly Functionality Validation Procedure for APS Photoinjector LACIS
      Y. Li, "Operation of the APS Photoinjector Drive Laser System," Light Source Note LS-307, rev. 1 (2008)
      Annual Validation Procedure for the APS Photoinjector LACIS (AES/SI)
      APS Linac/PAR ACIS Interlock Bypass Procedure to Support In-Tunnel APS Photoinjector Drive Laser Alignment (ASD/OA)
      Procedure for laser rod replacement (see SOP for authorized persons)
      DAZZLER installation and testing Job Safety Analysis (JSA) (bldg 212 CHM)


    Injector Test Stand (bldg 411)

      Experiment Planning and Safety Form (ESAF)
        Download form (go to Info, click on Native File)
        Archive/active experiments
      Injector Test Stand ACIS Operational Procedures
      Linac Gun Test Room Search Procedure (ASD/OA)
      LEUTL Readiness Review and related documents (ICMS search results)
      H. Moe, "Radiological Considerations in the Operation of the Low-Energy Undulator Test Line (LEUTL)," Light Source Note LS-272 (1998) (see Appendix B: Linac Modification to Accomodate rf Test Area and Laser Room)


    Surface Laboratory (bldg 401/L0109)

      Vacuum Safety
        Pressure and Vacuum Systems (Princeton U. Lab Safety Training Guide)
      Cryogenic Safety
        Cryogenic Safety training course ESH145 (not offered online)
        Cryogenic Safety Manual (ANL PHY division)
        Oxygen Deficiency Hazards (FNAL ES&H course)




    Maintained by K. Harkay
    Last updated: 2008 July 25