Listing of Statistics for Run1-2016 (Created Sat Feb 06 05:05:02 CST 2016)
User periods in this interval
02/02/2016 08:00 To 02/06/2016 05:01 93.02 Hours, Delivered Beam: 92.36 Hours, 1 Fault(s), 92.36 MTBF, 99.29% of Sched. Time
Total Amount of User Time in this interval 93.02 HoursDelivered Beam 92.36 Hours
Percentage of Scheduled Time (*) 99.29 %
Mean Time Between Faults (MTBF) 92.36 Hours
Downtime During Period 0.66 Hours
Total integrated Current During This Period 9.43 A-hr
Mean Fill Duration in Period 46.18 Hours
Faults per Day of Delivered Beam 0.26
Total Number of Faults 1
Valid fills Beginning in this Time Interval      
Fill # Start  End Duration
(min: 1.0)
Reason for Fill Termination Length of Downtime Downtime is associated with the end of a fill. The first fill of a period will have any downtime before the fill on the line above.

  0.00
# 1 02/02 08:00 To 02/04 08:49 48.82    0.66
# 2 02/04 09:29 To 02/06 05:01 43.54    Fill Ongoing -0.01
Top-Up Mode Statistics
Target Current Range +/- 2.0, Minimum Injector Downtime = 8.0 minutes Total
Current in Range during Scheduled Topup Time 99.22 %
Current in Range during Delivered Beam Time 100.00 %
Injector Availability 100.00 %
Period Beginning 02/02/2016 08:00
Current in Range 100.00 %
Injector Availability 100.00 %
The information on this page is automatically generated and may contain errors. An official operations statistics page will be posted at the end of each user period.