Lesson Module
A-2
Comprehensive Floor
Coordinator Tasks
page 3
Operations-Related
Tasks
APS Enable
- Evaluate and approve beamline readiness.
- Initiate APS Enable allowing beam into the
beamline.
Postings
- Understand the posting requirements and
responsibilities for a beamline: CAA, ESAF, Shutter Authorization
(green sheet), Administrative restriction (pink sheet), Ray tracings, RSS
devices list.
- Enter correct date/time data for the start/end of experiments, especially proprietary experiments, in the online ESAF entry form.
Global On Line
-
Putting a beamline Global On Line
- Understand Global On Line/Off Line Procedure
-
Approvals: PSS system manager, ACIS
system manager, Floor Coordinator
-
Notify control room of actions taken
-
Taking a Beamline Off Line
- Understand Global On Line/Off Line Procedure
-
Approvals: Floor Coordinator
- Notify control room of actions taken
Shielding Verifications
-
Set up beam scatter devices, ozone equipment,
and flight tubes.
-
Measure beamstops using Ray Trace information.
-
Assist in arranging for BCRRT, Beamline Commissioning
Readiness Review.
-
Prepare beamline configuration controls:
Configuration Control Components List (CCCL), tagging, etc.
-
Post commissioning documents, Commissioning
Activity Approval (CAA) form.
-
Assist Configuration Control System Manager (CCSM), Radiation Safety Officer (RSO), and Health Physics (HP): participation
and oversight.
-
Help to set up verification hardware and equipment.
- Verify FE-EPS readiness. Help Beamline Personnel with BL-EPS readiness.
- Verify ID positioning if shielding verification is done on an ID beamline.
- Provide Global Online.
- Administer APS Enable.
Mode Changes
Switch beam type between white, pink,
and monochromatic.