Argonne National Laboratory

Advanced Photon Source
User ESH Support

Argonne Home > Advanced Photon Source >
Lesson Module A-2
Comprehensive Floor Coordinator Tasks
page 2

Operations-Related Tasks: Responding to systems faults and failures

FCs are often the first to respond to user observations of system faults and failures.

  • Monitor Personnel Safety System faults
  • Fault  Appropriate Action
    Minor Fault (or Trip on beamlines with fully-upgraded PSS) Identification / Reset action / Notification to system specialists
    Serious Fault (or Fault on beamlines with fully-upgraded PSS) Identification / Reset action/ Notification to system specialists
    Major Fault (or Fault on beamlines with fully-upgraded PSS) Notification to system specialists
  • Monitor Equipment Protection System (EPS) faults
  • Fault Appropriate Action
    Water fault Identification / Notification to system specialists / Reset action
    Vacuum fault Identification / Notification to system specialists / Reset action
  • Beamline Equipment Protection System
    • BLEPS:  Fault location and identification as capable
    • When appropriate, refer users (especially independent investigators) to beamline staff for assistance.
  • Insertion Device System
    • Determine ID Access Mode
    • Interpret/Relay System Status Messages
    • Notification to Systems Specialist
  • File trouble reports using RMD system.
  • Monitor work requests that describe work to be done on local beamlines (often a follow-up to filing a trouble report).
  • Assist Building Management/Conventional Facilities Group/Main Control Room in monitoring the Liquid Nitrogen System and respond to instructions if needed.
--Next Page--


Contact Patti Pedergnana or Nena Moonier for information or problems relating to this web page.
2-20-13
U.S. Department of Energy UChicago Argonne LLC Office of Science - Department of EnergyOffice of Basic Energy Sciences - Department of Energy
Privacy & Security Notice | Contact Us | Site Map