For operational beamlines
the following information must be posted:
-
Experiment Approval Safety Form (ESAF) or APS Beamline Operations Approval Form:
Now replaces the CAA for beamlines designated as being operational.
-
Configuration Control Component List (CCCL):
The list showing all components that are under configuration control is
required for beamlines, operational or commissioning. The matching
color-coded
map again accompanies the CCCL.
- Anamorphic bremsstrahlung ray traces: Drawings in both the horizontal and vertical plane that project the radiation source through all apertures (optical stops) until the final bremsstrahlung stop is reached are still needed. Note: Some beamlines' ray traces are available via ICMS instead of the beamline end cabinets.
-
Please note:
-
The Shielding Verification Plan is no longer
needed.