FE-EPS Trip causing storage ring dump during User Beam and Machine Studies

System:   FE-EPS
Period:     User Beam and Machine Studies
Event:      FE-EPS trip causing storage ring dump

If the FE-EPS causes the storage ring to dump during a scheduled run cycle, explicit approval must be obtained from the PSS/FE-EPS on-call staff member before the system can be reset.

The following is a list of persons who may perform FE-EPS resets during User Beam once having received approval:

*   PSS/FE-EPS on call staff member
*   FE-EPS System Engineer or designee
*   On-shift Floor Coordinator
*   On-shift MCR Operator


J. Carwardine, 12/4/03