Sector 35 Operations
Control of Sector 35 shutter operation has been turned over to the Sector 35 (ASD) staff and the main control room (MCR) operators (ASD-OA). The MCR has full operation of the beam-line shutter controls, and also the permit to allow shutter enable for Sector 35 beam-lines.
Sector 35 beam-lines are the ONLY beam-lines that do not require Floor Coordinator site presence during machine studies.
All other aspects of FC responsibilities are the same for sector 35 beam-lines as for any other beam-line. The contact point is the ASD beamline staff when present or the MCR operators.
N. Moonier, revised 07/16/08
(W. Wesolowski, 12/4/02 (SO-BLS-35-03); W. Wesolowski, reviewed 2/17/03; W. Wesolowski, reviewed 3/10/04; K. Beyer, reviewed 01/31/05; K. Beyer, reviewed 01/31/06)