Survey and Alignment: Top-Up Operation
Click here to download an interactive .DWF file containing surveyed beam lines ready for top-up operation.Note: to view this file, download the WHIP! AutoCAD plug-in from Autodesk.
The drawing shows the bending magnet (BM-n) and insertion device (ID-n) beam lines. Green beam line labels indicate that the placement of the safety shutter at the front end of this line has been surveyed, while red labels show the beam lines that still require the measurement of the position of the safety shutter.
Clicking on a green beam line label brings up a graphical representation of the measurement results. These graphs show the deviations of the storage ring multipoles with respect to their ideal location in blue, while red markers represent the safety shutter location. Tolerance limits for the placement of these components are also shown in their respective colors. A beam line that shows all multipoles and safety shutter positions within the tolerance limits is deemed to be safe for top-up operation.
Static versions of the graphs (.gif format):
|
1BM 1ID 2BM 2ID 3BM 3ID 4ID 5BM 5ID 6BM 6ID |
7BM 7ID 8BM 8ID 9BM 9ID 10BM 10ID 11BM 11ID 12BM 12ID |
13BM 13ID 14BM 14ID 15BM 15ID 17BM 17ID 18BM 18ID 19BM 19ID |
20BM 20ID 32ID 33BM 33ID 34BM 34ID 35BM 35ID |