Version 1 & 2 Document Index

Documents that do not have links are available from the Safety Interlocks Group secretary.

Global Requirements

  • Organization & Mission Statement - E000P-901010
  • Software Configuration Management Plan - E000P-901050
  • Software Coding Standards - E000P-901100
  • ISI Group Call-In Procedure - E000P-901300

 

Design Specifications

  • System Requirements - E000P-911010
  • Installation Statement of Work - E000P-911040
  • Cost Estimate - E000P-911070
  • ICD ACIS to PSS - E000P-911080
  • ICD Front End Shutters to PSS
  • ICD Integral Shutters to PSS - E000P-911060
  • ICD FEEPS to PSS - E000P-911050-03 04/23/03
  • ICD BL-EPS to PSS - E000P-911092-02 08/23/02
  • ICD DIW to PSS - E000P-911095
  • ICD PSS to Beamline User Remote Shutter Control - E000P-912000-06 08/01/01
  • System Specification - E000P-912010
  • Hardware Inventory - E000P-912011
  • Hardware Requirements Specifications - E000P-914929
  • Hardware Design Documents - E000P-914030
  • Software Version Control - E000P-915000
  • System Acceptance Test Plan/Procedure - E000P-917010
  • Validation Procedure for Temporary Remote Shutter Interface - E000P-917050

 

Technical & Personnel Procedures

  • Hardware Configuration - E000P-921030
  • Key Management Replacement - E000P-921035
  • One for One Parts Replacement - E000P-921040
  • PSS Jumper Installation and Removal Procedure - E000P-921045
  • Floor Manager Training - E000P-921050
  • User Manual - E000P-921070
  • User/Operator Training - E000P-921080
  • Mode Control Specifications - E000P-921100
  • Search and Secure Procedures - E000P-921120
  • Search and Secure Verification - E000P-921121
  • System Configuration Management Procedure - E000P-921130
  • Work Request Procedure and Forms - E000P-921140
  • Administrative Control Process - E000P-921150
  • Hardware Workmanship Acceptance - E000P-921160
  • Serious Fault Resetting Procedure - E000P-921170

 

Test Procedures and Results

  • PSS Component Replacement Revalidation Procedure- E000P-956020
  • Validation Record - E000P-956030
  • BL-EPS to FE-EPS Interface Validation - E000P-956050
  • System Acceptance Test and Validation Procedure - E000P-957010
  • I/O Configuration Procedure - E000P-957012
  • PSS Initial System Test - E000P-957013
  • Communications Configuration Validation - E000P-957015
  • I/O Validation Test "A" - E000P-957020
  • I/O Validation Configuration Procedure - E000P-957022
  • Validation Code Download Procedure Chain A & Chain B - E000P-957024
  • I/O Validation Test "B" - E000P-957030
  • Task and System Checkout - E000P-957035
  • PSS/ACIS Trip Test - E000P-957040
  • PSS DIW Circuits Validation - E000P-957045
  • Quick DIW Test - E000P-957047
  • PSS/ACIS FES Wiring Tests - E000P-957050
  • FE Critical Devices Validation - E000P-957055
  • PSS Shutter Calibration - E000P-957060
  • Remote Shutter Interface Validation - E000P-957065
  • PSS User Controls Interface - E000P-957070
  • Validation Matrix Report - E000P-957075
  • PSS Validation Handbook - E000P-957080
  • Installation, Checkout and Validation of the PSS User BL-EPS System E000P-957085

 

Reviews and Studies

 