ME Group Work Flow


 

 

 

 

 

 

 

 

 


 

Ed Theres’ areas of Responsibility:

 

  1. All Front End and Beamline water and mechanical work (Except Controls and Metering)
  2. All tunnel mechanical work
  3. All Mechanical Work not water related
  4. All Mechanical work requested from outside the group

 

 

Rich Ferry’s areas of Responsibility:

 

  1. All Secondary Water Systems
  2. All Mezzanine Mechanical work
  3. All Beamline water from the Mechanical Mezzanine to the Hutch
  4. All Metering and Controls