BEAMLINE WATER SYSTEMS MAINTENANCE RECORDS
|
| Date |
Requestor |
Beamline/Station |
Item |
Work Performed |
Comments |
Details |
| 10/1/2004 |
J. Koss |
31-ID-C |
PSS Mask |
Placed BL-EPS mask on PSS per
Mohan. |
See details |
31-IDpssMaskOct04.pdf |
| 10/1/2004 |
J. Koss |
31-ID-C |
PSS Mask |
Replace all
compression fittings on mask |
Leaks at several
threaded joints; replaced using Loctite Red. |
|
| 10/1/2004 |
J. Koss |
31-ID-C |
Slits (BL-EPS) |
Replaced DP
transmitter with flow |
See details |
31-IDslitsOct04.pdf |
| Sept.
2004 |
J. Burke |
3-ID-A |
Slits (BL-EPS) |
Removed orifice
from supply line |
Flow signal up to
39 inWC from 35 inWC |
|
| Sept.
2004 |
D.Keane |
5-ID-A |
Beam stop (PSS) |
Replaced filter |
Low flow reading
compared to trip point |
5-IDbeamstopOct04.pdf |
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|